Laserfiche WebLink
<br />Non-Professional Services Agreement between May 15, 2024 <br />City of San Leandro and AAA Tree Service —Exhibit A Page 3 of 6 <br />SPILL PREVENTION & CONTROL: The Contractor shall take precautions to prevent accidental spills <br />during the work under this contract and keep a stockpile of spill control materials, such as rags or <br />absorbents, readily accessible onsite. <br />In the event of a spill, the Contractor shall: <br />1. Report any hazardous materials spills immediately to the Alameda County Fire Department, the <br />Alameda County Hazardous Materials Division, and other state and local agencies as required by <br />state and local regulations. <br />2. Immediately contain and prevent leaks and spills from entering the storm drain system, and <br />properly clean up and dispose of the waste and clean up materials. <br />3. Not wash any spilled material into the streets, gutters, storm drains, or creeks. <br />STORM WATER BEST MANAGEMENT PRACTICES: To eliminate storm water pollution, the Contractor <br />shall implement effective control measures at construction sites. BMPs include schedules of activities, <br />prohibition of practices, general good housekeeping practices, operational practices, pollution prevention <br />practices, maintenance procedures, and other management procedures to prevent the discharge of <br />pollutants directly or indirectly to the storm drain system. <br />• The Contractor shall implement all applicable BMPs including but not limited to the following: <br />• All construction materials shall be stored at least ten feet away from inlets, catch basins, and curb <br />returns. <br />• Store materials that have the potential to be transported to the storm drain system, by storm <br />runoff or by a spill, under cover in a contained area or in sealed waterproof containers. <br />• During wet weather or when rain is in forecast, store materials that can contaminate rainwater or <br />be transported by storm water or other runoff to the storm drain system inside a building or cover <br />them with a tarp or other waterproof material secured with weights to prevent contact with rain <br />• Use tarps on the ground to collect fallen debris or splatters that could contribute to storm water <br />pollution. <br />• Pick up litter, construction debris, and other wastes daily from outside areas including the <br />sidewalk area, gutter, street pavement, and storm drains impacted by the project; all wastes shall <br />be stored in covered containers or disposed of or recycled immediately. <br />• Inspect vehicles and equipment arriving on -site for leaking fluids, and promptly repair leaking <br />vehicles and equipment; use drip pans to catch leaks until repairs are made. <br />• Avoid spills by handling materials carefully <br />• Storage and disposal of all hazardous materials such as paints, thinners, solvents, and fuel; and <br />all hazardous wastes such as waste oil must meet all federal, state, and local standards and <br />requirements. <br />• For guidance on selecting and implementing effective control measures the Contractor is directed <br />to California Stormwater Quality Association (CASQA) at: http://www.casqa.org. <br />STORAGE OF EQUIPMENT AND MATERIALS : The Contractor shall secure, as necessary, for use <br />during the duration of the project, property for equipment storage, stockpiling materials and other <br />construction related activities as needed. The Contractor shall submit a letter indicating the staging area <br />location, the property owner’s name, address, and phone number, and the owner’s signed consent for the <br />use of the property for the duration of the project. No storage will be permitted on private property within <br />the City of San Leandro unless a Use Permit indicating proper zoning has been obtained from the City’s <br />Community Development Department, Planning Division. <br />Unless a staging area is described on the plans or in the specifications, construction materials and <br />equipment shall not be stored in streets, roads, highways, or on public property except during its actual <br />use on the work. Any staging area provided by th e City is provided as-is without warranty that it is <br />DocuSign Envelope ID: A433418C-F218-42DF-892A-6A085877FA21