My WebLink
|
Help
|
About
|
Sign Out
Home
NPSA Silverado Marina Office Demo (2)
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2024
>
NPSA Silverado Marina Office Demo (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2025 10:54:42 AM
Creation date
8/7/2024 9:13:11 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
5/3/2024
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Non-Professional Services Agreement between <br />City of San Leandro and Silverado Contractors Inc—Exhibit A Page 3 of 3 <br />o Piles shall not be rinsed or washed. The storage area for the piles shall include straw <br />bales, filter fabric, or other containment devices to contain runoff. <br />o During removal of the existing dock system, floating rafts and/or trash and debris <br />containment booms shall be placed under the docks and around the areas of <br />demolition to contain debris that may be released during these activities. <br />o Pile removal shall only occur during low tide periods to minimize the amount of <br />sediments re-suspended in the water column. <br />o No fueling, cleaning, or maintenance of vehicles or equipment shall take place within <br />an area where an accidental discharge to navigable waterways may occur. <br />o All vehicles and equipment operating within or adjacent to the marina or other <br />waterways shall be visually inspected for fuel or waste releases before the beginning <br />of the work day. If spillage or leaks occur during the work day, they shall be noted and <br />recorded and immediate action shall be taken for removal and disposal. <br />o Floating booms shall be available for containing spills or debris discharged into the <br />water during demolition and construction activities and any debris shall be removed as <br />soon as possible but no later than the end of each day. <br />Section 3: Demolition <br />Contractor shall: <br />1.Remove the superstructure including items attached to the superstructure and handrails at <br />perimeter. <br />2.Remove the floor/deck including landing at top of gangway. Scope includes removal of joists, rim <br />joists, beams, and girders. <br />3.Remove burned portions of piles <br />4.Remove the gangway to the landing of the Marina Office <br />5.Remove docks and piles as necessary to accomplish the work. Docks shall be removed to existing <br />joints. <br />DocuSign Envelope ID: B8461B43-7014-48A0-B405-9EE0D96295C3
The URL can be used to link to this page
Your browser does not support the video tag.