Laserfiche WebLink
<br />July 15, 2024 Page 24 City of San Leandro Post Collection <br />C. Substitute Scales. If any scales are inoperable, being tested, or otherwise unavailable, Contractor 912 <br />shall use reasonable business efforts to weigh vehicles on the remaining operating scales. To the 913 <br />extent that all the scales are inoperable, being tested, or otherwise unavailable, Contractor shall as 914 <br />soon as possible substitute portable scales until the permanent scales are replaced or repaired. 915 <br />Contractor shall arrange for any inoperable scale to be repaired as soon as possible and, in any 916 <br />event, within seventy-two (72) hours (excluding Holidays) of the failure of the permanent scale. If 917 <br />repairs to the permanent scale are projected to take more than twelve (12) hours, Contractor shall 918 <br />immediately obtain a temporary substitute scale(s). 919 <br />Contractor shall as soon as possible provide back-up generator(s) capable of supplying power to 920 <br />the scales in the event of a power outage. 921 <br />D. Estimates. Pending substitution of portable scales or during generator outages, Contractor shall 922 <br />estimate the Tonnage of City Delivered Materials delivered to the Approved Facility(ies) by utilizing 923 <br />the arithmetic average of each vehicle’s recorded Tons of the City Delivered Materials delivered on 924 <br />its preceding three (3) deliveries, on the same calendar day of the week, to the Approved 925 <br />Facility(ies). Contractor shall continue to record all information required by this Section 5.2.8 for 926 <br />each delivery of City Delivered Materials to the Approved Facility(ies) and each Transported load of 927 <br />City Delivered Materials during any period the scales are out of service. 928 <br />E. Testing. Contractor shall test and calibrate all scales in accordance with Applicable Law, but at least 929 <br />every twelve (12) months. Upon City request, Contractor shall promptly provide City with copies of 930 <br />test results. Contractor shall further test and calibrate any or all scales within three (3) Working 931 <br />Days of City direction. If test results indicate that the scale or scales complied with Applicable Law, 932 <br />City shall reimburse Contractor the direct costs of the tests. If the test results indicate that the scale 933 <br />or scales did not comply with Applicable Law, Contractor shall bear the costs thereof and Contractor 934 <br />shall at its own cost adjust and correct, consistent with the results of that test, all weight 935 <br />measurements recorded and Per-Ton Rates calculated, charged, and paid, as the case may be, from 936 <br />the date of City’s direction. 937 <br />F. Weighing Standards and Procedures. Contractor shall use the Approved Facility’s(ies’) entry 938 <br />scale(s) located at the scale house to weigh vehicles and charge Per-Ton Rates. Contractor scale 939 <br />house personnel shall be responsible for inspecting City Delivered Materials delivered to the 940 <br />Approved Facility(ies). Contractor shall charge the Per-Ton Rate approved by the City for each 941 <br />material type delivered by the Collection Contractor. The total rate charged per load of City 942 <br />Delivered Material shall be based on the material type and the total Tonnage of City Delivered 943 <br />Materials in the Collection Contractor’s vehicle. Contractor shall weigh and record inbound weights 944 <br />of all Collection Contractor’s vehicles when the vehicles arrive at the Approved Facility(ies) and 945 <br />weigh and record outbound weights of vehicles for which Contractor does not maintain tare weight 946 <br />information. Contractor shall provide each driver a receipt showing the date, time in, time out, 947 <br />Facility name and address, ticket number, operator identification, customer number, vehicle 948 <br />identification, waste origination, total amount due, a description of weight codes where applicable, 949 <br />material types, gross weight, tare weight, net weight, and quantity, of each material type of City 950 <br />Delivered Materials that the vehicle delivered to the Approved Facility(ies) and the Per-Ton Rate 951 <br />charged therefore. 952 <br />G. Records. Contractor shall maintain scale records and reports that provide information including 953 <br />date of receipt, inbound time, inbound weights of vehicles, vehicle identification number, 954 <br />Docusign Envelope ID: C78C62DE-8589-496F-8F5A-DEC38EE5853C