Laserfiche WebLink
<br />July 2024 Page 43 City of San Leandro Post Collection <br />TABLE 2 1623 <br />Example A Calculation of Recyclable Materials Processing Costs for Rate Period Three 1624 <br />Residue Disposal Credit Component Calculation 1625 <br /> 1626 <br /> 1627 <br />TABLE 3 1628 <br />Example A Calculation of Recyclable Materials Processing Costs for Rate Period Three 1629 <br />Residue Disposal Component Calculation 1630 <br /> 1631 <br /> 1632 <br />MRF Residue avg.23.4% <br />Recyclables collected - projected 11399.5 tons <br />Residue projected 2667.48 tons <br />Residue composition results 22.9% Residue Study <br />Recyclables collected - projected 11399.5 tons <br />Adjusted residue projected 2610.49 tons <br />Residue difference -57.00 tons <br />Disposal and transportation Exhibit E3-3 165.53$ per ton <br />Processing cost adjustment (9,434.54)$ <br />Processing cost adjustment (9,434.54)$ <br />Recyclables collected - projected 11399.5 tons <br />Processing cost adjustment (0.83)$ per ton <br />MRF efficiency loss 7.8%Residue Study <br />MRF efficiency loss applied 96.1% @ 50% of Study <br />Net Processing cost residue adjustment w/efficiency (0.80)$ per ton <br />RY 3 <br />RY3 <br />Disposal 1,582,316.08$ <br />Transportation 1,281,986.20$ <br />2,864,302.28$ <br />Total All Recycling Tons Collected 73,950.00 <br />Average MRF Residue 23.4% <br />All Residue tons 17,304.30 <br />Disposal and Transportation per ton 165.53$ <br />Docusign Envelope ID: DD1D0F3A-E7BC-4C69-8F25-5A59BD356B1B