Laserfiche WebLink
<br />July 2024 Page 44 City of San Leandro Post Collection <br />EXAMPLE B 1633 <br />1. Assumptions for Example Recyclable Materials Processing Cost Calculation: 1634 <br />a. Then-current Rate Period = Rate Period Two (July 1, 2026 through June 30, 2027) 1635 <br />b. Coming Rate Period = Rate Period Three (July 1, 2027 through June 30, 2028) 1636 <br />c. Recyclable Materials Processing Costs per Ton for then-current Rate Period= $130.53 per 1637 <br />Ton 1638 <br />d. Net Residue Disposal Costs for the coming Rate Period = $1,839,540 1639 <br />f. Proposed Base Tons Processed = 72,317 Tons 1640 <br />g. Actual Recyclable Material Tonnage for February 1, 2025 through January 31, 2026 = 1641 <br />72,500 Tons 1642 <br />h. Recyclable Material Tonnage for the most-recently completed 12-month period= 84,100 1643 <br />Tons 1644 <br />i. Residue Study Results for City of San Leandro = 7.8% 1645 <br />j. Recyclable Commodity Value for the most recently completed 12-month period = 1646 <br />$6,398,742. 1647 <br />Note: All values presented in the following table are hypothetical and used for illustrative 1648 <br />purposes only. 1649 <br />Docusign Envelope ID: DD1D0F3A-E7BC-4C69-8F25-5A59BD356B1B