Laserfiche WebLink
<br />Version: 17 April 2024 Page 36 Proposal Form <br />Rehabilitation Phase for Annual Street Paving 21-23 Project No. 2022.0050 <br />CONTRACT PRICE SCHEDULE <br />Item <br />No. Description <br />Estimated <br />Quantity <br />(A) <br />Unit of <br />Measure <br />Item UNIT Price <br />(in Words) <br />Item UNIT <br />Price (B) <br />(in Figures) <br />TOTAL PRICE <br />(AxB) <br />(in Figures) <br />1 Mobilization and General <br />Conditions per Section 9- <br />3.4 <br />1 LS Three hundred thirty thousand <br />dollars <br /> <br />$330,000 <br /> <br />$330,000 <br />2 Construction Surveying per <br />Section 2-9 1 LS Fifteen thousand dollars <br /> <br />$15,000 <br /> <br /> <br />$15,000 <br /> <br />3 Water Pollution Control <br />and SWPPP per Section 7- <br />8.6 <br />1 LS Twenty thousand dollars <br /> <br />$20,000 <br /> <br />$20,000 <br />4 Traffic and Pedestrian <br />Control, Temp. Signage <br />per Section 600 <br />1 LS Six hundred eighty-one thousand <br />four hundred sixty-three dollars <br /> <br />$681,463 <br /> <br /> <br />$681,463 <br /> <br />5 Clearing & Grubbing per <br />Section 300-1 1 LS Forty thousand dollars <br /> <br />$40,000 <br /> <br />$40,000 <br />6 Tree Removal per Section <br />300-1 3 EA Two thousand dollars <br /> <br />$2,000 <br /> <br />$6,000 <br />7 Potholing per Sections 5-1 <br />and 306-0 1 LS One hundred thirty thousand <br />dollars <br /> <br />$130,000 <br /> <br />$130,000 <br />8 Adjust Gas Valve Box to <br />Grade per Section 301-1.6 1 EA Two thousand dollars <br /> <br />$2,000 <br /> <br />$2,000 <br />9 Adjust Water Valve Box to <br />Grade per Section 301-1.6 29 EA Two thousand dollars <br /> <br />$2,000 <br /> <br />$58,000 <br />10 Adjust Utility Manhole <br />Frame & Cover to Grade <br />per Section 301-1.6 <br />21 EA Two thousand dollars <br /> <br />$2,000 <br /> <br />$42,000 <br />11 Adjust Sanitary Sewer <br />Lamphole Frame & Cover <br />to Grade per Section 301- <br />1.6 <br />3 EA Two thousand dollars <br /> <br /> <br />$2,000 <br /> <br /> <br />$6,000 <br />12 Adjust Monument Box & <br />Cover to Grade per <br />Section 301-1.6 <br />5 EA Two thousand dollars <br /> <br />$2,000 <br /> <br />$10,000 <br />13 Remove and Replace <br />Detector Handhole per <br />Sections 301-1.3, 700, 701 <br />1 EA One thousand five hundred dollars <br /> <br />$1,500 <br /> <br />$1,500 <br />14 Remove and Rebuild <br />Survey Monument per <br />Section 309-3.1 <br />8 EA Three thousand dollars <br /> <br />$3,000 <br /> <br />$24,000 <br />15 Remove Obstructions from <br />Driveways per Section <br />300-1.3 <br />5 EA Five hundred dollars <br /> <br />$500 <br /> <br />$2500 <br /> <br />Docusign Envelope ID: C04669A7-472C-4C9A-AB9B-0F9E0F652DBC