My WebLink
|
Help
|
About
|
Sign Out
Home
DSG Agreement (2)
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2024
>
DSG Agreement (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2024 11:01:09 AM
Creation date
9/16/2024 11:01:06 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Version: 17 April 2024 Page 37 Agreement <br />Rehabilitation Phase for Annual Street Paving 21-23 Project No. 2022.0050 <br />Item <br />No. Description <br />Estimated <br />Quantity <br />(A) <br />Unit of <br />Measure <br />Item UNIT Price <br />(in Words) <br />Item UNIT <br />Price (B) <br />(in Figures) <br />TOTAL PRICE <br />(AxB) <br />(in Figures) <br />16 Remove and Replace <br />Traffic Loop Detectors per <br />Section 300-1.3, 700 and <br />701 <br />4 EA Two thousand five hundred <br />dollars <br /> <br /> <br />$2,500 <br /> <br /> <br />$10,000 <br />17 Remove and Replace <br />Concrete Curb and Gutter <br />per Section 303-5 <br />160 LF One hundred forty dollars <br /> <br />$140 <br /> <br />$22,400 <br />18 Remove and Replace <br />Concrete Rolled Curb and <br />Gutter per Section 303-5 <br />28 LF One hundred fifty dollars <br /> <br />$150 <br /> <br />$4,200 <br />19 Remove and Replace <br />Concrete Valley Gutter per <br />Section 303-5 <br />240 SF Forty dollars <br /> <br />$40 <br /> <br />$9,600 <br />20 Remove and Replace <br />Residential Concrete <br />Driveway per Sections 301 <br />and 303-5 <br />460 SF Thirty dollars <br /> <br /> <br /> $30 <br /> <br /> <br />$13,800 <br />21 Remove and Replace <br />Commerical Concrete <br />Driveway per Sections 301 <br />and 303-5 <br />26 SF Thirty dollars <br /> <br /> <br />$30 <br /> <br /> <br />$780 <br />22 Remove and Replace <br />Concrete Sidewalk per <br />Section 303-5 <br />259 SF Twenty-five dollars <br /> <br />$25 <br /> <br />$6,475 <br />23 Full Depth Base Repair (4 <br />Inches) per Section 302-3 151 TON Three hundred dollars <br /> <br />$300 <br /> <br />$45,300 <br />24 Cold Milling Asphalt <br />Pavement (2-Inch Depth) <br />per Section 302-1 <br />3,135 SY Eleven dollars <br /> <br />$11 <br /> <br />$34,485 <br />25 Cold Milling Asphalt <br />Pavement (2.5-Inch Depth) <br />per Section 302-1 <br />1,900 SY Fifteen dollars <br /> <br />$15 <br /> <br />$28,500 <br />26 Remove Surfacing and <br />Base per Setion 302-1 499 CY One hundred dollars <br /> <br />$100 <br /> <br />$49,900 <br />27 Remove FDR with Cement <br />per Section 302-1 2,161 CY Two hundred dollars <br /> <br />$200 <br /> <br />$432,200 <br />28 Compact Existing Street <br />Base or Subgrade Material <br />per Section 301-1 <br />1,279 SY Fifteen dollars <br /> <br />$15 <br /> <br />$19,185 <br />29 Subgrade Over-Excavation <br />(Revocable Item) per <br />Section 301-1.3 <br />43 CY One hundred dollars <br /> <br />$100 <br /> <br />$4,300 <br />30 Full Depth Reclamation <br />with Portland Cement (8- <br />inch Depth) per Section <br />301-3.4 <br />13,022 SY Fifteen dollars <br /> <br /> <br />$15 <br /> <br /> <br />$195,330 <br /> <br />Docusign Envelope ID: C04669A7-472C-4C9A-AB9B-0F9E0F652DBC
The URL can be used to link to this page
Your browser does not support the video tag.