My WebLink
|
Help
|
About
|
Sign Out
Home
Amendment_No_3_Terraphase_09132024
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2024
>
Amendment_No_3_Terraphase_09132024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2024 1:50:47 PM
Creation date
9/27/2024 1:50:44 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Amendment No. 3 to <br />Consulting Services Agreement between City of San Leandro and Terraphase Engineering, Inc 9/13/2024 <br />for Treatment Wetland Design Services Page 2 of 8 <br />Task 1 Scope of Work <br />The proposed scope of work to implement the pilot test is broken into the following tasks: <br />Task 1.1: Premobilization <br />Terraphase will complete subcontract execution with Odin and issue a formal Notice to Proceed to Odin. <br />Terraphase and Odin will complete premobilization activities, including: <br />•Revision of the Terraphase Health and Safety Plan for the site to cover pilot test <br />implementation. <br />•Preparation for and attendance of a 1-hour project kickoff meeting to be attended by the City, <br />Terraphase, and Odin. Terraphase will prepare the meeting agenda, lead the meeting, and <br />issue meeting minutes. The meeting will be held over teleconference. <br />•Terraphase attendees will include Lucas Paz, Shakeel Jogia, and Terraphase’s project <br />engineer. <br />•Odin attendees will include their operations manager, project superintendent, and project <br />engineer. <br />•Terraphase review of Odin technical submittals as described in the Work Plan and RFP and <br />follow up coordination with Odin. The following submittals will be submitted by Odin and <br />reviewed by Terraphase: <br />o Pilot Test Implementation Work Plan <br />o Pilot Test Quality Control Plan <br />o Contractor’s Proposed Geotechnical Testing Laboratory <br />o Materials submittals <br />o Implementation Schedule <br />Terraphase will issue Approval to Mobilize upon acceptance of all preconstruction submittals. <br />Task 1.2: Pilot Test Implementation and Oversight <br />Odin will implement the Pilot Test under Terraphase oversight and in accordance with the Terraphase-Odin <br />contract and approved submittals. This task includes the value of the Odin subcontract. In their proposal, <br />Odin estimates field implementation of the pilot test to require one work week on site with 10-hour <br />workdays. <br />Terraphase will provide full time operational, safety, and quality assurance oversight during field <br />implementation. A field engineer will be present during all field operations, and the proposed budget <br />includes funding for full-time field engineer oversight for up to 6 workdays. <br />Shakeel Jogia will also be on-site during the first day of mixing operations, and both Shakeel Jogia and <br />Lucas Paz will perform 2 total additional partial-day site visits during implementation. Shakeel Jogia will <br />also provide office-based technical support, response to any subcontractor Requests for Interpretation or <br />technical requests, and logistical coordination throughout field implementation. <br />During field implementation, Terraphase will prepare and submit a daily report to the City that documents <br />pilot test implementation progress, quality control activities performed and data, technical issues, safety <br />observations, and includes a schedule lookahead through completion of field activities. The daily report will <br />include representative photos of the day’s operations. <br />Docusign Envelope ID: 53244CDF-B5C0-43CD-8884-BC457F7EFEA3
The URL can be used to link to this page
Your browser does not support the video tag.