My WebLink
|
Help
|
About
|
Sign Out
Home
Amendment_No_3_Terraphase_09132024
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2024
>
Amendment_No_3_Terraphase_09132024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2024 1:50:47 PM
Creation date
9/27/2024 1:50:44 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Amendment No. 3 to <br />Consulting Services Agreement between City of San Leandro and Terraphase Engineering, Inc 9/13/2024 <br />for Treatment Wetland Design Services Page 5 of 8 <br />•Proposal review and evaluation: Terraphase will review all proposals received by the City and <br />attend one teleconference to discuss any engineering/design feedback arising from proposal <br />review. <br />All communication with bidders during the bid period will be led by the City or others. <br />Task 3: Treatment Wetland Project Preconstruction Design Support <br />The Treatment Wetland Project will mobilize after an assumed 6-month stabilized surface settlement period <br />after completion of the Stabilization Project. <br />Task 3 Scope of Work <br />Task 3.1: Development of IFB PS&E <br />Terraphase will complete minor updates to the existing 100% design documents for use in the Treatment <br />Wetland Project bid package: <br />•IFB Design Plans: Terraphase will complete minor revisions to the 100% design drawings as <br />needed to incorporate into the Treatment Wetland Project RFP1. Terraphase expects design plan <br />revisions to be limited to hatching out work completed under the earlier Stabilization Project and <br />updating project title blocks for IFB version control. This task does not include substantial revision <br />of the actual engineering design elements depicted in the existing 100% plans. The compiled IFB <br />plan set will be submitted to the City for incorporation into the RFP. <br />•IFB Specifications: Terraphase will complete minor revisions to the 100% project specifications as <br />needed to incorporate the specifications into the Treatment Wetland Project RFP1. Terraphase <br />expects specification content revisions to be limited to removing content associated with work <br />completed under the earlier Stabilization Project. This task does not include substantial revision of <br />the actual engineering elements depicted in the existing 100% specifications. The compiled IFB <br />specifications set will be submitted to the City for formatting and incorporation into City format by <br />others. <br />•IFB Engineers Cost Estimate: Terraphase will update the 100% design cost estimate for the <br />Treatment Wetland Project. The estimate will delineate cost items that are to be built under the <br />Treatment Wetland Project contract, but otherwise does not include substantial revision of the <br />engineering design being estimated. Unit cost data will be escalated as needed to reflect 2025 <br />costs. The draft IFB estimate will be submitted to the City for review and comment, and this task <br />includes one round of final revisions to incorporate City review. <br />Task 3.2: Design Support during RFP Development <br />Terraphase will provide engineering design support during preparation of the RFP for construction of the <br />Treatment Wetland project. The RFP will be prepared by others, with Terraphase providing engineering <br />support as requested by the City. This task includes: <br />•Respond to technical requests during RFP preparation by others. <br />Docusign Envelope ID: 53244CDF-B5C0-43CD-8884-BC457F7EFEA3
The URL can be used to link to this page
Your browser does not support the video tag.