Amendment No. 3 to <br />Consulting Services Agreement between City of San Leandro and Terraphase Engineering, Inc 9/13/2024 <br />for Treatment Wetland Design Services Page 6 of 8 <br />•Complete one round of review of the draft RFP1 from an engineering/design perspective prior to <br />City issuance. <br />Task 3.3: Bid Period Design Support <br />Terraphase will provide engineering design support during the construction bid period, including: <br />•Pre-bid conference: The pre-bid conference will be planned, scheduled, and led by the City or <br />others, with Terraphase project leads, including the project manager and design lead, to provide <br />technical support at the City’s direction. The conference agenda and all other materials will be <br />prepared by others. Post-conference summary and actions will be provided by others. <br />•Bidder question response and RFP1 addenda: Terraphase project leads will review bidder <br />questions as they are submitted to the City and support the City in development of up to six RFP1 <br />addenda. Addenda will consist of written/narrative question responses, recommended revisions to <br />technical content in the RFP1, or revision markups to IFB plans and specifications. <br />•Proposal review and evaluation: Terraphase will review all proposals received by the City and <br />attend one teleconference to discuss any engineering/design feedback arising from proposal <br />review. <br />All communication with bidders during the bid period will be led by the City or others. <br />Task 4: Project Management and Coordination <br />Terraphase will provide project and financial management of the proposed scope of work, including: <br />o During execution of Task 1, Terraphase will provide weekly updates to the City throughout the <br />premobilization, field implementation, and post-test sampling phases of the project. After submittal <br />of the draft closeout report, Terraphase and the City will meet to discuss report comments and <br />lessons learned from the pilot test to be incorporated into the final pilot test closeout report and <br />planning and development of the full-scale stabilization project. <br />o Attendance of two 1-hour construction procurement kickoff meetings with the City, one for each <br />contract package (Tasks 2 and 3). The kickoff meeting will planned and scheduled by others, with <br />Terraphase responsible for preparing materials limited to Terraphase’s design support role. <br />o Coordination and communication of project status during active Terraphase involvement during <br />Tasks 2 and 3, including internal technical coordination and weekly status updates with the City. <br />This update will include update of a project status and issues table and weekly teleconference <br />status meeting with the City, Terraphase project manager (Lucas Paz, PhD), and Terraphase <br />design support lead (Shakeel Jogia, PE, PMP, CCM). <br />o Low-level project status coordination with the City during the inactive period between completion of <br />Task 2 and initiation of Task 3 to account for stabilized surface settlement after completion of the <br />Soil Stabilization Project and before installation of the treatment wetland. This task assumes brief <br />monthly updates with the City for an up to 6-month inactive period. <br />Docusign Envelope ID: 53244CDF-B5C0-43CD-8884-BC457F7EFEA3