Laserfiche WebLink
<br /> <br />Page 58 of 65 <br /> <br />Task 11: Environmental Review <br />MIG will lead the Environmental Review, with GCC supporting. The Environmental Review <br />Scope of Work conservatively assumes producing a program level Supplemental EIR that may <br />tier off of previous EIRs (2017 Bay Fair TOD Specific Plan EIR and 2022 Housing Element EIR). <br /> <br />MIG’s scope of work proposes two administrative drafts and a screen check of the SEIR. All <br />draft and final Development Plan deliverables shall be provided in an editable MS Word file and <br />a complete PDF document via digital file sharing system. Our budget assumes MIG will receive <br />one consolidated set of comments on all draft documents. <br /> <br />11.1 Administrative Draft Supplemental Environmental Impact <br />Report (SEIR) <br />MIG would prepare an Administrative Draft Supplemental EIR (SEIR) according to CEQA <br />Guidelines Section 15163. The Supplemental EIR would follow the organizational structure of <br />the 2017 Specific Plan EIR. It will analyze the additional environmental impacts associated with <br />the proposed Development Plan and identify any new impacts and mitigation measures needed <br />to reduce the impacts to less than significant levels. The Supplemental EIR will analyze <br />alternatives to the proposed Development Plan that reduce identified impacts. <br /> <br />MIG will rely on information and data prepared by the project team to describe the proposed <br />Development Plan and Specific Plan Amendment and to document environmental conditions. <br />MIG will rely on traffic and transportation data prepared by the team transportation engineer to <br />support the air quality, GHG/energy, and noise analysis, and any alternatives analysis needed <br />to address potentially significant transportation impacts associated with the proposed <br />Development Plan. <br /> <br />MIG will prepare a 1st Administrative Draft Supplemental EIR, respond to one set of <br />consolidated comments and prepare a 2nd Administrative Draft Supplemental EIR. We will <br />respond to consolidated comments on the 2nd Administrative Draft EIR and provide a Screen <br />Check document for final City approval. MIG’s budget does not include providing any print <br />copies of any deliverables. <br /> <br />MIG would prepare the Administrative Draft SEIR with text, illustrations, and tables which clearly <br />and concisely describe the proposed changes to the Bay Fair TOD Specific Plan. The SEIR <br />Development Plan description will heavily rely on text provided by the Development Plan and <br />Specific Plan Amendments documents. For each environmental topic, the Administrative Draft <br />SEIR would summarize how the Bay Fair TOD Specific Plan Update, as well as any changes in <br />environmental conditions since the EIR certification, affect each 2017 Specific Plan EIR impact <br />and mitigation findings, and whether there are any new or substantially more severe significant <br />impact findings or mitigation needs beyond what was previously considered in the certified <br />Docusign Envelope ID: 885601F4-01B5-4FAB-A341-08EBC29876AA