My WebLink
|
Help
|
About
|
Sign Out
Home
CSA Pacific Wastewater Optimization 12-23-2024
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2025
>
CSA Pacific Wastewater Optimization 12-23-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2025 4:57:02 PM
Creation date
3/6/2025 4:56:53 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and Last revised 12/23/2024 <br />Pacific Wastewater Optimization for Capital Program Management Services Exhibit A – Page 1 of 2 <br />EXHIBIT A <br />SCOPE OF SERVICES <br /> <br />Task 1: Rehabilitation of 2512 Davis Street Storage Building <br />The Storage Building scope includes painting, security, electrical service, lighting, demolition of existing <br />office space, and repair of existing structural elements. Plans and bids will be prepared by trade – with 3-5 <br />separate contracts expected for painting, electrical/lighting, demo, security, exterior doors and column <br />repairs. <br />Deliverables: Prepare and bid plans for demo, column repair, security, roll up door, exterior repairs, and <br />paint. Prepare electrical and lighting plans for bid under separate contract. <br />Task 2: Fixed Film Reactor Demolition and Removal <br />The Fixed Film Reactor demolition will be publicly bid. The demolition will be organized into two phases. The <br />first is the demolition, disposal/recycling as applicable of all steel and concrete, and compaction of the plastic <br />media into bales. A second phase/bidding effort is anticipated to dispose of the media. <br />Deliverables: Prepare bid documents. Proposed approach is to demo and bale media. Disposal to be bid <br />separately. Costs include disposal bidding as well. <br />Task 3: Effluent Pump Station Project MCC Predesign Project Management <br />The effluent pump station electrical system is scheduled for upgrade. This project will define the parameters <br />work to be included in the project. Pacific Wastewater Optimization will work with staff to define project goals, <br />gather background materials and prepare a request for proposals or quote <br />Deliverables: Review predesign memos, attend design meetings, and general project management <br />oversight. <br />Task 4: Valley Service Area Reconnection Study Project Management <br />A study is needed to determine the feasibility of reconnecting the “Valley Service Area” to the San Leandro <br />collection system. Pacific Wastewater Optimization will work with staff to define project goals, gather <br />background materials and prepare a request for proposals or quote. <br />Deliverables: Define scope and basic input variables (revenues, alignment). Seek proposals from 3 firms <br />(LCC, Nute, and West Yost) and provide review comments. <br /> <br /> <br />Docusign Envelope ID: DBB00E9D-5C7E-4FB2-BE6E-25881BC2C7EC
The URL can be used to link to this page
Your browser does not support the video tag.