My WebLink
|
Help
|
About
|
Sign Out
Home
Climatec_Amendment_3_Final
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2025
>
Climatec_Amendment_3_Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2025 4:57:36 PM
Creation date
3/6/2025 4:57:34 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Amendment No. 3 to Installation <br />Agreement between City of San Leandro and 02/12/2025 <br />Climatec LLC for WPCP Efficiency Projects Page 3 of 7 <br /> <br />ATTACHMENT A <br />Amendment Scope of Work <br />High Strength Waste (HSW) Receiving Facility <br /> <br />Provide engineering and design of necessary infrastructure in order to make food <br />processing waste reception of 5,800 gallons per day possible at Digester #4 (west of <br />the FOG building). <br />o Scope of Work includes: <br />• Engineering design, consistent with Brown and Caldwell plans dated <br />March 2022. <br /> <br />o Scope Assumptions: <br />• The existing FOG control panel can be reused for sending <br />communication signals to plant SCADA system <br />• The existing “FOG” line from Digester #4 control building to <br />the old micro turbines can be reused <br />o Scope of Work Excludes: <br />• Any construction, installation or programing. <br /> <br /> <br />Biogas to RNG (Renewable Natural Gas) System <br /> <br />Provide engineering, design, and permitting assistance of plant infrastructure to <br />produce Renewable Natural Gas from the current facility biogas supply (up to 200 <br />cubic feet per minute). Scope of Work includes: <br />• Engineering design, including design for the flare, consistent with <br />Brown and Caldwell plans dated March 2022. <br />• Modification of existing piping at Digester #4 to allow for future <br />connection of biogas processing equipment <br />• Replace biogas pipes connecting gas conditioning area to pressure relief <br />valves <br />• Provide one (1) new gas upgrading system consisting of: <br />• Siloxane removal <br />• H2S removal <br />• Moisture removal <br />• CO2 removal <br />• Provide one (1) RNG compressor, including variable frequency drive, <br />motor start panel, compressor, CNG dryer and 1-postion trailer <br />connection hose <br />• Bay Area Air Quality Management District permit update coordination <br />through permit issuance <br />Docusign Envelope ID: 6BEB24F4-5845-43B0-B263-0568B625C51E
The URL can be used to link to this page
Your browser does not support the video tag.