My WebLink
|
Help
|
About
|
Sign Out
Home
Climatec_Amendment_3_Final
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2025
>
Climatec_Amendment_3_Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2025 4:57:36 PM
Creation date
3/6/2025 4:57:34 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Amendment No. 3 to Installation <br />Agreement between City of San Leandro and 02/12/2025 <br />Climatec LLC for WPCP Efficiency Projects Page 4 of 7 <br /> <br />o Scope Assumptions: <br />• The existing FOG control panel can be reused for sending <br />communication signals to plant SCADA system <br />• The City may be required to modify plant or operations to achieve <br />compliance with the Bay Area Air Quality Management District. <br />o Scope Exclusions: <br />• Any construction, installation or programing. <br />Digester Mixer Replacement <br /> Provide and install two (2) new high efficiency propeller mixers in Digester #4. <br />o Scope of Work Includes: <br />• Engineering design, consistent with plans dated 02/18/2022, with <br />approval by the City Engineer <br />• Equipment pads as required <br />• Provide and install two (2) new mixers through the digester roof deck <br />• SCADA programming for the addition of this equipment. <br />• Electrical connection at existing MCC <br />• Electrical conduit and required panels/connections <br />• Equipment and system start-up and testing. <br />o Scope Assumptions: <br />• The existing FOG control panel is reused for sending <br />communication signals to plant SCADA system <br />o Scope Exclusions: <br />• Controls routing between the FOG building and nearest <br />Programmable Logic Controller (PLC) cabinet (see assumption <br />above) <br />• Any SCADA upgrades <br /> Replace existing Digester #4 mixing pump with a Sulzer pump <br />o Scope of Work Includes: <br />• Demolition, removal and disposal of the existing Digester #4 <br />mixing pump and ancillary piping <br />• Equipment pad as required <br />• Install one (1) Sulzer pump (City supplied) <br />• Provide and install soft start starter package for Sulzer pump <br />• Provide and install all necessary suction and discharge piping <br />• Electrical disconnect and reconnect <br />• Start-up and testing of equipment and system operation. <br />o Scope Exclusions: <br />• No electrical conduit or conductor replacement or modifications <br />Docusign Envelope ID: 6BEB24F4-5845-43B0-B263-0568B625C51E
The URL can be used to link to this page
Your browser does not support the video tag.