My WebLink
|
Help
|
About
|
Sign Out
Home
CSA Pascuzzo Pate Golf Design v2
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2025
>
CSA Pascuzzo Pate Golf Design v2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2026 3:25:52 PM
Creation date
7/1/2025 1:48:05 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
4/7/2025
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />• Prepare a package including technical specifications, general conditions, specific conditions and bid form that conform to the City of <br />San Leandro standards. <br />• Prepare updated budgets for construction of the golf course at the end of this phase, prior to soliciting bids. <br />• Site meetings to review the drawings and construction issues. <br /> <br />Phase III Contractor Selection Phase <br /> <br />SCOPE OF WORK: Our work in this phase will focus upon coordinating with Gordian during the bid and selection process . <br /> <br />TASKS AND DELIVERABLES <br /> <br />• Schedule and conduct pre-bid meetings to review the project with the potential contractors. <br />• Respond to questions received from the bidders during the bid process. <br />• Develop any addendum as needed to clarify items related to golf course construction. <br />• Make value engineering decisions with the client, to bring the project into budget if bids are too high. <br />• We will schedule and attend a pre-construction meeting with the selected contractor. <br /> <br /> <br />Phase IV Construction Observation Phase <br /> <br />SCOPE OF WORK: We believe a project of this nature will achieve its highest and best result by making sure that the designers are on site fr equently <br />to “handcraft” the golf course. This is accomplished by working closely with the contractor to impart the detail and nuan ce that will make the <br />course successful. We will also use this time on site to resolve any unknown issues that may arise during construction. As the construction work is <br />completed, we will continue to coordinate with the golf course superintendent throughout the grow-in period until the golf course is ready to open. <br /> <br />TASKS AND DELIVERABLES <br /> <br />• Attend coordination meetings and make additional periodic site visits as needed, to observe the construction of the work. As a <br />result of these visits, we will provide clarifications to the drawings and field directions to the contractor as needed. <br />• Review and advise on all applications for payment. <br />• With city approval, prepare and issue change orders. <br />• Prepare final punch list and project close-out. <br /> <br /> <br /> <br /> <br /> <br />Exhibit ADocusign Envelope ID: 0D529D13-8AB3-4EFC-96F1-517D568830FE
The URL can be used to link to this page
Your browser does not support the video tag.