My WebLink
|
Help
|
About
|
Sign Out
Home
8A Public Hearings
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250121
>
8A Public Hearings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2025 2:03:11 PM
Creation date
9/8/2025 3:58:27 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
1/21/2025
Retention
Perm
Document Relationships
Reso 2025-008 Rejecting Appeal (PLN24-0040)
(Amended)
Path:
\City Clerk\City Council\Resolutions\2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COPY <br />City Hall <br />835 East 14th Street <br />San Leandro, California <br />City of San Leandro <br />Legislation Details (With Text) <br /> Version: 124-496 Name: <br />Status:Staff Report <br />In control: <br />PLN23-0031 CUP 80-ft high Wireless Telecom <br />Facility at 440 Peralta Ave <br />Filed <br />Planning Commission and Board of Zoning <br />Adjustments <br />11/7/2024 11/7/2024Final action: <br />Enactment #: <br />File #: <br />Type: <br />On agenda: <br />Enactment date: <br />Title: <br />Indexes: <br />Code sections: <br />Attachments: <br />PLN23-0031; Consideration of a Conditional Use Permit (CUP) to build an 80-foot high Wireless <br />Telecommunications Facility at 440 Peralta Ave. APN: 075-0225-001-04. Zoning District: DA-2. <br />Applicant: Tower Engineering Professionals. Property Owner: Donald R. and Jo A. Lee Trust. <br />1.Att 1 Resolution 24-XXX_PLN23-0031, 2. Att 1_Exhibit A_Project Statement_PLN23-0031, <br />3. Att 1_Exhibit B_Project Plans_11x17_PLN23-0031, 4. Att 2 Vicinity Map_PLN23-0031, <br />5. Att 3 Development Regulations_PLN23-0031, 6. Att 4 Photo Sims_PLN23-0031, <br />7. Att 5 EME Report_PLN23-0031, 8. Att 6 Five-Year Plan_PLN23-0031, <br />9. Att 7 Alternative Sites Analysis_PLN23-0031, 10. Att 8 Public Comments_PLN23-0031 <br />Date Action ResultVer. Action By <br />Received and FiledPlanning Commission and <br />Board of Zoning Adjustments <br />11/7/2024 1 Pass <br />PLN23-0031; Consideration of a Conditional Use Permit (CUP) to build an 80-foot high Wireless <br />Telecommunications Facility at 440 Peralta Ave. APN: 075-0225-001-04. Zoning District: DA-2. <br />Applicant: Tower Engineering Professionals. Property Owner: Donald R. and Jo A. Lee Trust. <br />SUMMARY AND RECOMMENDATIONS <br />The applicant is requesting approval of a Conditional Use Permit (CUP) to build a new Wireless Telecommunications <br />Facility at 440 Peralta Avenue. The Wireless Telecommunications Facility would consist of a freestanding 80-foot high <br />monopole designed to resemble a pine tree (“monopine”) and related equipment. Staff recommends that the Planning <br />Commission adopt the attached Resolution, approving the Conditional Use Permit (PLN23-0031), based on the <br />recommended Findings of Fact and subject to the recommended Conditions of Approval. <br />BACKGROUND AND RELATIONSHIP TO SURROUNDING AREA <br />The project site is 440 Peralta Avenue, a 57,784 square foot parcel in the DA-2 (Downtown Area 2) zoning district. The L- <br />shaped parcel has frontage along San Leandro Boulevard and Peralta Avenue. The site contains a 23,200 square foot <br />warehouse and a 2,100 square foot garage, with two ancillary parking areas. Nearby properties, to the northeast, include <br />a tow yard, warehouses, public storage facilities, Siempre Verde Park, and single-family residences across San Leandro <br />Boulevard. On the west side, there are overhead BART rail lines, Union Pacific rail lines, and the southern portion of <br />Cherrywood residential tract. <br />PROJECT PROPOSAL <br />The applicant, Tower Engineering Professionals, is proposing to build a new Wireless Telecommunications Facility that <br />will support cellular service in San Leandro and AT&T’s FirstNet broadband network, that is being developed for the use <br />of emergency responders. See Attachment 1, Exhibit A: Project Statement. <br />The proposed Wireless Telecommunications Facility would be located at the rear of the subject property, within an <br />City of San Leandro Printed on 12/17/2024Page 1 of 4 <br />powered by Legistar™ <br />ATTACHMENT C - Planning Commission Staff Report <br />Att C -
The URL can be used to link to this page
Your browser does not support the video tag.