My WebLink
|
Help
|
About
|
Sign Out
Home
5A Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250203
>
5A Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2025 2:20:46 PM
Creation date
9/8/2025 4:47:10 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
2/3/2025
Retention
Perm
Document Relationships
Reso 2025-010 CSA McGuire & Hester Amendment 2
(Amended)
Path:
\City Clerk\City Council\Resolutions\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of San Leandro <br />City Council <br />Meeting Date: February 3, 2025 <br />Agenda Number: 5.a. <br />Agenda Section: CONSENT CALENDAR <br />File Number: 25-030 <br />File Type: Staff Report <br />COUNCIL PRIORITY <br />·Public Safety <br />·Infrastructure <br />SUMMARY <br />The attached resolution approves and authorizes the City Manager to execute Amendment No. 2 <br />to a Non-Professional Services Agreement (NPSA) with McGuire & Hester for additional scope <br />and fee to complete the removal and demolition work at the site of the pedestrian bridge that <br />connects Haas Avenue to Cary Drive. <br />RECOMMENDATIONS <br />Staff recommends that the City Council adopt a resolution to approve and authorize the City <br />Manager to execute Amendment No. 2 to a NPSA with McGuire & Hester for the Hass Avenue <br />Pedestrian Bridge removal and demolition project. <br />BACKGROUND <br />In March 2023, three eucalyptus trees fell into the San Leandro Creek, destroying the pedestrian <br />bridge that links Haas Ave and Cary Drive. In September 2023, a time and materials emergency <br />contract was awarded to McGuire & Hester for demolition and removal services at the site. Also <br />in September 2023, Amendment No. 1 to extend the term of the agreement with McGuire & <br />Hester was executed. <br />The fallen trees and pedestrian bridge were removed from the creek, the site was regraded, <br />erosion control and groundcover were installed on the hillsides, the roadway was graded, fencing, <br />vehicle, and pedestrian barriers were installed, and a formerly buried storm drain manhole was <br />restored and cleaned out. The City will repave the roadway and plant trees to replace those <br />damaged by the work shortly; the City will be responsible for the health of the replacement trees <br />and groundcover for a period of 10 years. <br />Analysis <br />The contract with McGuire & Hester is for actual costs on a time and materials basis with an <br />estimated cost of $227,500. The original estimate includes 8 items of work: 1. Mobilization, 2. <br />Dewatering, 3. Initial Grading, 4. Removal and Replacement of the metal beam guard rails, 5. <br />Page 1 City of San Leandro Printed on 9/4/2025
The URL can be used to link to this page
Your browser does not support the video tag.