My WebLink
|
Help
|
About
|
Sign Out
Home
5B Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250303
>
5B Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2025 2:32:36 PM
Creation date
9/9/2025 10:13:59 AM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
3/3/2025
Retention
Perm
Document Relationships
Reso 2025-016 Change Order Amount for Annual Street Paving Project No. 2022.0050
(Amended)
Path:
\City Clerk\City Council\Resolutions\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File Number: 24-586 <br />Applicable General Plan Policies <br />·Policy T-5.3 - Maintenance. Regularly maintain City streets and traffic control devices to <br />ensure that streets operate safely and efficiently. The City will strive for an overall <br />Pavement Condition Index of 76, which is the lower limit of industry best practices <br />·Policy T-2.1: Complete Streets Serving All Users and Modes. Create and maintain <br />“complete” streets that provide safe, comfortable, and convenient travel through a <br />comprehensive, integrated transportation network that serves all users <br />·Policy T-7.2: Capital Improvements. Identify capital improvements and other measures <br />which improve the safety of bicyclists, pedestrians, and motor vehicles on San Leandro <br />Streets <br />Environmental Review <br />A CEQA exemption was filed on April 14, 2022 with the Alameda County Clerk’s office. <br />Summary of Public Outreach Efforts <br />The Notice to Bidders was published in the Daily Review, the South County Post, Vision Hispana <br />and World Journal. Staff also notified local builders’ exchanges and construction data firms, as <br />well as a list of contractors that asked to be notified of bidding opportunities via email. The project <br />is described on the Engineering and Transportation Department website. <br />Two mandatory pre-bid meetings were held on May 7 and May 9, 2024, with potential bidders. <br />Prior to any construction which would affect access to private businesses or residences, the <br />contractor provided advance notification in the form of door hangers before the work started. <br />Contract Change Order Summary <br />CCO No.Description Amount % <br />1 Increased base repair quantity, bid item 23 $177,527.50 5% <br />2 Increased base repair quantity, bid item 23 $177,527.50 5% <br />3 Increased base repair quantity, bid item 23, $177,527.50 5% <br />and speed bump installation <br />4 * Increased base repair quantity, bid item 23, $177,527.50 5% <br />and increased hand mix quantity, bid item 27 <br />5 * Increased hand mix quantity, bid item 27 $54,292.76 1.5% <br />Estimated Change Order Total $764,402.76 21.5% <br />*CCO items to be executed after City Council approval. <br />Page 3 City of San Leandro Printed on 9/4/2025
The URL can be used to link to this page
Your browser does not support the video tag.