My WebLink
|
Help
|
About
|
Sign Out
Home
5E Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250407
>
5E Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2025 4:57:24 PM
Creation date
9/15/2025 9:06:49 AM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
4/7/2025
Retention
Perm
Document Relationships
Reso 2025-030 Lease Agreement with Fluence Corporation
(Amended)
Path:
\City Clerk\City Council\Resolutions\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br />6. Demobilization <br />The Demonstration Plant Equipment will be decommissioned under supervision from <br />Fluence. The Client is responsible for providing: <br /> <br />A. Cleaning and disinfecting the Demonstration Plant Equipment in accordance with <br />the O&M Manual requirements referenced herein and included in Appendix 5. <br />B. Disconnecting power, communications and all piping connections. <br />C. Loading the equipment onto the respective shipping vehicle. <br /> <br />Demonstration program <br />7. Demonstration Set Up <br />The Demonstration system will be installed as per Interface Diagram below. It will operate <br />as per the Demonstration Protocol. It is critical that secondary clarified effluent source <br />water be fed to the unit after dichlorination and have no residual free Chlorine. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Blower Skid (Process Blower + Mixing <br />Blower) <br />Secondary Clarifier Overflow Dechlorinated, high TKN water Biologically treated, low TN effluent <br />8. Method <br />The Demonstration Equipment is fully automated. The Demonstration Equipment’s <br />contaminant removal capability is identical in every way to a full-scale production <br />platform. <br />Consequently, full-scale system design is simply a matter of a linear scaling up in capacity <br />based on the demonstration data. <br />Demonstration programs consist of a series of sample runs at various operating <br />parameters to determine purification rates. During sampling, influent and effluent <br />samples will be drawn for analysis. <br />Aspiral L5 <br />Fine S creen
The URL can be used to link to this page
Your browser does not support the video tag.