Laserfiche WebLink
22 <br />h. Monitor the hypochlorite concentration weekly and replenish it to maintain a consistent level between <br />2–5 ppm. <br />i. Before restarting the reactor, drain the storage solution and refill the reactor with clean water. <br />j. Operate the under-tower mixing system for 10 minutes to flush out residual chemicals, ensuring the <br />membranes are ready for operation. <br /> <br />Warnings: <br /> Exposure to direct sunlight can degrade the membranes; always keep the membranes submerged and <br />shielded from UV light. <br /> Avoid exceeding the specified hypochlorite concentration of 10 ppm for long-term soaking. <br /> For any uncertainties or additional assistance, consult a Fluence representative. <br /> <br /> <br />