My WebLink
|
Help
|
About
|
Sign Out
Home
5E Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250407
>
5E Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2025 4:57:24 PM
Creation date
9/15/2025 9:06:49 AM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
4/7/2025
Retention
Perm
Document Relationships
Reso 2025-030 Lease Agreement with Fluence Corporation
(Amended)
Path:
\City Clerk\City Council\Resolutions\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IN THE CITY COUNCIL OF THE CITY OF SAN LEANDRO <br />RESOLUTION NO. 2025-XXX <br />RESOLUTION TO APPROVE AND AUTHORIZE THE CITY MANAGER TO EXECUTE A LEASE AGREEMENT <br />WITH FLUENCE CORPORATION FOR THE PILOT TESTING OF A MEMBRANE AERATED BIOFILM <br />REACTOR SYSTEM FOR A TOTAL LEASE NOT TO EXCEED AMOUNT OF $195,000 <br />WHEREAS, the City of San Leandro’s Water Pollution Control Plant (Plant) plans to repurpose an <br />underutilized 6.9-acre wastewater retention pond on site into a multi-benefit treatment wetland; and <br />WHEREAS, the purpose of the Treatment Wetland project is to remove nitrogen and other <br />contaminants from a portion of the Water Pollution Control Plant’s discharge water; and <br />WHEREAS, the City has selected a modular Membrane Aerated Biofilm Reactor system for <br />nitrification of Plant effluent prior to releasing to the treatment wetland for removal of nitrogen; and <br />WHEREAS, the City has a desire to run a pilot test to ensure that the system meets the <br />requirements of the project prior to procurement. <br />NOW, THEREFORE, the City Council of the City of San Leandro does RESOLVE as follows: <br />That the agreement is approved and the City Manager or her designee is hereby authorized and <br />directed to execute the lease agreement with Fluence Corporation for the Pilot Testing of a Membrane <br />Aerated Biofilm Reactor System at the City’s Water Pollution Control Plant location at 3000 Davis Street, <br />San Leandro, for a total lease amount not to exceed $195,000; and <br />That the City Manager is authorized to take all actions and execute all documents necessary to <br />effect the purpose and intent of this Resolution. <br />Introduced by Councilmember _______________ and passed and adopted this 7th day of April 2025 <br />by the following vote: <br />AYES: () <br />NOES: () <br />ABSENT: () <br />ATTEST: <br />Kelly B. Clancy, CMC <br />City Clerk DRAFT
The URL can be used to link to this page
Your browser does not support the video tag.