Laserfiche WebLink
3 <br /> After proposal execution <br />o A location suitable for installation of the Demonstration Equipment at the <br />Delivery Point <br />o Secondary clarified, de-chlorinated effluent to feed directly into Fluence battery <br />limits <br />o Civil detailed design for overall Site at the Delivery Point <br />o Detailed Site electrical design and onsite electrical supply, electrical works and <br />communication <br />o Location and method of discharge of treated effluent <br />o All permits and related fees <br />o Proof of insurance <br />o Project manager (point of contact) <br /> Delivery <br />o Completed civil works ready to set the Demonstration Equipment <br />o Site security at the Delivery Point <br />o Offloading and Site movement of Demonstration Equipment <br /> Installation <br />o Installation of Demonstration Equipment including power supply, utilities, <br />interconnecting piping, Aspiral L5 inlet and outlet piping, fittings and valves as <br />identified on the Aspiral L5 data sheet. <br />o Electrical and communication (wired/mobile) supply to main control cabinet <br /> Start-up <br />o Lab tests and analysis <br />o Qualified operator <br />o Raw unfiltered sampling data <br />o All consumables <br />o Permitted or otherwise legal discharge location <br />o See Appendix 3 for further specifications <br /> Operation <br />o All consumables <br />o Sampling data as described below