Laserfiche WebLink
Project Description <br /> <br />Environmental Impact Report 2-9 <br />interior clear height of 40 feet. Figure 2-4, which is a conceptual site plan, shows the location of the <br />proposed warehouse on the project site. <br />As shown on Figure 2-4, sixty-four loading docks are proposed, 27 on the north side and 37 on the <br />south side of the building. In addition to dock doors, traditional doors for egress and ingress to the <br />building would be provided for each of the two office spaces within the proposed warehouse. <br />Traditional doors would be provided on the north side of the building and south side of the building, <br />next to dock doors. <br />The exterior of the proposed warehouse would be constructed of a mix of materials, including <br />concrete panels, corrugated and noncorrugated metal panels, wood finish/trim, and glazing. Glazing <br />refers to the glass installed in the building such as windows. Glazing would be a mix of insulated <br />glass installed over concrete and other materials, and glass installed over openings to serve as <br />traditional windows. Generally, given the proposed warehouse use, exterior windows would be <br />limited to the office use areas of the buildings. Figure 2-5 shows conceptual elevations of the <br />proposed building, including identifying the various exterior finishes and glazing that would be used. <br />Conceptual renderings of the project are shown on Figure 2-6. <br />At the time of publishing of this EIR, a tenant has not been identified for the proposed building. <br />However, operational hours and activities would be typical of a warehouse land use. The building <br />would be constructed for a speculative tenant or tenants; the project is intended for occupancy by <br />uses consistent with the site’s General Industrial General Plan land use designation, as well as those <br />uses permitted under the site’s Industrial General zoning classification. Based on employee <br />generation rates published by the U.S. Green Building Council (2023), the proposed project would <br />employ approximately 152 full-time employees.1 <br />2.5.3 Circulation/Access and Parking <br />Access to the project site would be from the driveway on Doolittle Drive in the southwest area of <br />the site, and from the end of Hester Street in the northern area of the site, as shown on Figure 2-4. <br />Although these are both existing driveways, the proposed project would include reconstruction of <br />the driveways to meet City standards and current ADA requirements. This would involve repairs as <br />needed of the driveway from Doolittle Drive. New curb cut would be provided at the cul-de-sac on <br />Hester Street, which would also include reconstructing (i.e., replacement of) portions of the <br />sidewalk along the project site frontage on Hester Street. Additionally, a new, second, driveway to <br />the site would be constructed at the end of Hester Street, providing a total of three driveways. <br />The proposed driveways would lead to internal access and circulation roads that encircle the <br />proposed warehouse as well as surface parking areas that would be provided on the west and north <br />sides of the warehouse. The internal circulation roads are designed to comply with standards for <br />passenger vehicles, tractor-trailers, and emergency equipment like fire engines and ambulances. <br />The internal circulation road would be wide enough to allow tractor trailers to maneuver in reverse <br />into loading docks on the north and south side of the warehouse, as shown on Figure 2-4. <br /> <br /> <br />1 (229,573 square foot warehouse distribution use/2,500 square foot per employee) + (15,000 square foot office use/250 square foot per <br />employee) = 152 employees (US Green Building Council 2023). Numbers may not add up due to rounding.