Laserfiche WebLink
BUILDING <br />Fee <br />No.Fee Name Fee Unit / <br />Type Notes Current Fee / <br />Deposit <br />100% Cost <br />Recovery <br />Fee <br />FY 25-26 Rec'd <br />Fee Level / <br />Deposit <br />iv) Stand-Alone Mechanical Permit <br />2,000$ base fee @ <br />$2,000 105$ 425$ $ 425 <br />2,001$ base fee @ <br />$2,001 209$ 425$ $ 425 <br />5,001$ base fee @ <br />5,001 209$ 956$ $ 956 <br />each additional $1000 or fraction thereof each add'l <br />$1,000 41.83$ 74.34$ $ 74.34 <br />10,001$ base fee @ <br />$10,001 418$ 1,328$ $ 1,328 <br />each additional $1000 or fraction thereof each add'l <br />$1,000 13.94$ 6.64$ $ 6.64 <br />50,001$ base fee @ <br />$50,001 976$ 1,593$ $ 1,593 <br />each additional $1000 or fraction thereof each add'l <br />$1,000 13.94$ 23.37$ $ 23.37 <br />100,001$ base fee @ <br />$100,001 1,673$ 2,761$ <br />each additional $1000 or fraction thereof each add'l <br />$1,000 13.94$ 3.19$ <br />500,001$ base fee @ <br />$500,001 7,249$ 4,036$ <br />each additional $1000 or fraction thereof each add'l <br />$1,000 13.94$ 8.07$ <br />v) Residential 1 and 2 Family Re-roof <br />a) Main dwelling roof per permit 292$ 637$ $ 637 <br />b) Detached garages and accessory structures on <br />same property as main dwelling and done at the per permit 93$ 531$ $ 319 <br />vi) Inspection of the installation of an earthquake gas <br />shutoff valve per permit 35$ 319$ $ 150 <br />vii) Residential Seismic Retrofit projects using "Plan set <br />A" (for one and two family residences)per permit 81$ 743$ $ 81 <br />viii) Electric Vehicle Charger at 1 or 2 Family Residences per permit NEW 319$ $ 319 <br />ix) Photovoltaic Systems [3] <br />a) Residential <br />i) Up to 15kW per permit 314$ 531$ $ 450 <br />ii) each additional kW over 15kW per permit 16$ 35$ $ 15 <br />b) Commercial <br />i) Up to 25kW per permit 438$ 956$ $ 956 <br />ii) 26kW - 50kW per permit 658$ 956$ $ 956 <br />iii) each additional kW (51kW - 250kW)per permit 7$ 19$ $ 7 <br />iv) each additional kW over 250kW per permit 5$ 19$ $ 5 <br />City of San Leandro <br />Master Fee Schedule <br />Proposed <br />Building <br />22 of 69