Laserfiche WebLink
BUILDING <br />Fee <br />No.Fee Name Fee Unit / <br />Type Notes Current Fee / <br />Deposit <br />100% Cost <br />Recovery <br />Fee <br />FY 25-26 Rec'd <br />Fee Level / <br />Deposit <br />x) Signs [4] <br />a) 1st New sign attached to building. (Energized <br />or Not)per permit 117$ 478$ $ 478 <br />b) each additional sign thereafter:per permit 59$ 212$ $ 212 <br />c) Pylon sign, energized or not, each: (Height - <br />5'1'' and Taller)per permit 248$ 1,274$ $ 1,274 <br />d) Monument sign, energized or not, each (5ft <br />and Under)per permit 185$ 1,168$ $ 1,168 <br />e) Relocation or alteration of any sign <br />electronically or mechanically, but not including <br />replacement of tubing, transformers and such <br />parts subject to failure; or shop inspection by the <br />local inspection department in lieu of a UL label <br />(a local electrical inspection department label of <br />approval shall be required), each <br />per permit 93$ 850$ $ 850 <br />xi) Demolition <br />a) Commercial/Residential Demolition up to <br />3,000SF <br />base fee @ <br />3,000SF 315$ 850$ $ 850 <br />b) Each Additional 10,000SF each add'l <br />10,000SF 209$ 637$ $ 637 <br />xii) Addressing Fee <br />a) First 10 Addresses per permit 136$ 319$ $ 319 <br />b) Each Additional (Over 10)per permit NEW 11$ $ 11 <br />City of San Leandro <br />Master Fee Schedule <br />Proposed <br />Building <br />23 of 69