Laserfiche WebLink
PUBLIC WORKS - ENGINEERING <br />Fee <br />No.Fee Name Fee Unit / <br />Type Notes Current Fee / <br />Deposit <br />FY 25-26 Rec'd <br />Fee Level / <br />Deposit <br />100% Cost <br />Recovery <br />Fee <br />2.3 POD, Containers, Dumpsters Permit Fee flat fee New 748$ 622$ <br />2.4 Sewer Lateral and Storm Drain Permit Fee (non-subdivision)flat fee <br /> A. Residential flat fee New 1,494$ 1,494$ <br /> B. Commercial/Industrial flat fee New 1,744$ 1,744$ <br />2.5 Storm Drain Permit Fee (non-subdivision)flat fee New 1,744$ 1,744$ <br />2.5 2.6Monitoring Well installation and abandonment Fee per permit New 1,993$ 1,993$ <br />2.62.7 News rack Permit <br />A. Permit Issuance and Inspection per permit $ 205 498$ 498$ <br />B. Maintenance Deposit deposit $100 + $5 per <br />news rack <br /> $100 + $5 per <br />news rack <br />3.0 Bonding Requirements for Restoration <br />See <br />separate <br />document <br />from PW <br />Engineering <br />Division <br /> New As determined <br />by City Engineer <br />4.0 General Land Development Permit Fees <br />A. Permit Processing Fee (Applies to item 4.2)per permit $ 65 374$ 374$ <br />B. Project Submittal Intake Fee per permit New 498$ 498$ <br />4.1 Subdivision: <br />A. Parcel Map Waiver/Lot Line Adjustment/or Certificate of <br />Compliance/Easement Dedication, Right of Way Dedication <br />Review <br />deposit $ 1,600 5,980$ 5,980$ <br />B. Subdivision Map Review <br />B.1 Parcel Map deposit $ 4,000 14,768$ 14,768$ <br />B.2 Tract Map deposit $ 4,000 22,536$ 22,536$ <br />B.2.a Additional Tract Map Review Fee Per Lot deposit per <br />lot $ 100 249$ 249$ <br />Per Project Review Fee (DELETED)deposit $ 4,000 -$ <br />Per Lot Review Fee (DELETED)deposit per <br />lot $ 100 -$ <br />C. Tentative Subdivision Map Review deposit Direct Costs 12,458$ 12,458$ <br />D. Subdivision Grading/Improvement Plan/Review and <br />Inspection deposit <br /> 3% of estimated <br />cost of <br />improvements <br />(2500 min $100K <br />max) <br /> 3% of estimated <br />cost of <br />improvements <br />(5000 min $100K <br />max) <br />E. Subdivision Grading/Improvement Inspection (DELETED)deposit 3% of estimated -$ <br />E. Amended Map or Certificate of Correction deposit New 8,970$ 8,970$ <br />F. Street Vacations/Abandonment, Right of Way Dedication <br />Review deposit New 12,458$ 12,458$ <br />City of San Leandro <br />Master Fee Schedule <br />Proposed <br />PW - Engineering <br />39 of 69