My WebLink
|
Help
|
About
|
Sign Out
Home
8D Public
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250505
>
8D Public
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2025 9:31:02 AM
Creation date
9/15/2025 12:18:19 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
5/5/2025
Retention
Perm
Document Relationships
Ord 2025-004 Business License Tax for 2025-26
(Amended)
Path:
\City Clerk\City Council\Ordinances\2025
Ord 2025-005 Emergency Medical Services Tax for 2025-26
(Amended)
Path:
\City Clerk\City Council\Ordinances\2025
Ord 2025-006 Emergency Communications System Access Tax for 2025-26
(Amended)
Path:
\City Clerk\City Council\Ordinances\2025
Reso 2024-044 Stormwater Fee Amendment
(Amended)
Path:
\City Clerk\City Council\Resolutions\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS - ENGINEERING <br />Fee <br />No.Fee Name Fee Unit / <br />Type Notes Current Fee / <br />Deposit <br />FY 25-26 Rec'd <br />Fee Level / <br />Deposit <br />100% Cost <br />Recovery <br />Fee <br />4.2 Grading Permits (not a subdivision): <br />A. Plan Review <br />Residential deposit $ 3,000 7,475$ 7,475$ <br />Non-Residential deposit $ 3,000 14,950$ 14,950$ <br />B. Inspection <br />Residential deposit $ 3,000 4,983$ 4,983$ <br />Non-Residential deposit $ 3,000 18,688$ 18,688$ <br />C. Performance Bond per permit As determined <br />by City Engineer <br /> As determined <br />by City Engineer <br />D. Erosion and Sediment Control Bond per permit As determined <br />by City Engineer <br /> As determined <br />by City Engineer <br />5.0 Building Permits (includes up to 3 reviews)[4] <br />A. Residential per project 226$ 748$ 748$ <br />B. Non-Residential per project 238$ 1,993$ 1,993$ <br />C. Traffic Plan Review Fee per project New 872$ 872$ <br />D. Demolition Permit Erosion Control Inspection <br />up to 10 days Demo flat New 997$ 997$ <br />10 + days deposit New 4,983$ 4,983$ <br />E. 4th and subsequent review fee T&M New T&M <br />6.0 Impact Fees Per Impact Fee <br />Schedule <br /> Per Impact Fee <br />Schedule <br />A. Park Facilities Development Impact Fees [1] Per Impact Fee <br />Schedule <br /> Per Impact Fee <br />Schedule <br />B. Overhead Utility Conversion Per Impact Fee <br />Schedule <br /> Per Impact Fee <br />Schedule <br />C. Development Fees for Street Improvements (DFSI) [2] Per Impact Fee <br />Schedule <br /> Per Impact Fee <br />Schedule <br />E. Davis-Doolittle Traffic Impact Fee Per Impact Fee <br />Schedule <br /> Per Impact Fee <br />Schedule <br />F. Marina /Interstate 880 Traffic Impact fee Per Impact Fee <br />Schedule <br /> Per Impact Fee <br />Schedule <br />City of San Leandro <br />Master Fee Schedule <br />Proposed <br />PW - Engineering <br />40 of 69
The URL can be used to link to this page
Your browser does not support the video tag.