Laserfiche WebLink
PUBLIC WORKS - ENGINEERING <br />Fee <br />No.Fee Name Fee Unit / <br />Type Notes Current Fee / <br />Deposit <br />FY 25-26 Rec'd <br />Fee Level / <br />Deposit <br />100% Cost <br />Recovery <br />Fee <br />4.2 Grading Permits (not a subdivision): <br />A. Plan Review <br />Residential deposit $ 3,000 7,475$ 7,475$ <br />Non-Residential deposit $ 3,000 14,950$ 14,950$ <br />B. Inspection <br />Residential deposit $ 3,000 4,983$ 4,983$ <br />Non-Residential deposit $ 3,000 18,688$ 18,688$ <br />C. Performance Bond per permit As determined <br />by City Engineer <br /> As determined <br />by City Engineer <br />D. Erosion and Sediment Control Bond per permit As determined <br />by City Engineer <br /> As determined <br />by City Engineer <br />5.0 Building Permits (includes up to 3 reviews)[4] <br />A. Residential per project 226$ 748$ 748$ <br />B. Non-Residential per project 238$ 1,993$ 1,993$ <br />C. Traffic Plan Review Fee per project New 872$ 872$ <br />D. Demolition Permit Erosion Control Inspection <br />up to 10 days Demo flat New 997$ 997$ <br />10 + days deposit New 4,983$ 4,983$ <br />E. 4th and subsequent review fee T&M New T&M <br />6.0 Impact Fees Per Impact Fee <br />Schedule <br /> Per Impact Fee <br />Schedule <br />A. Park Facilities Development Impact Fees [1] Per Impact Fee <br />Schedule <br /> Per Impact Fee <br />Schedule <br />B. Overhead Utility Conversion Per Impact Fee <br />Schedule <br /> Per Impact Fee <br />Schedule <br />C. Development Fees for Street Improvements (DFSI) [2] Per Impact Fee <br />Schedule <br /> Per Impact Fee <br />Schedule <br />E. Davis-Doolittle Traffic Impact Fee Per Impact Fee <br />Schedule <br /> Per Impact Fee <br />Schedule <br />F. Marina /Interstate 880 Traffic Impact fee Per Impact Fee <br />Schedule <br /> Per Impact Fee <br />Schedule <br />City of San Leandro <br />Master Fee Schedule <br />Proposed <br />PW - Engineering <br />40 of 69