Laserfiche WebLink
Attachment C <br /> <br /> <br />Consulting Services Agreement between City of San Leandro and <br />Schaaf and Wheeler for Caltrans TCD Compensation– Page 2 of 2 <br /> <br />Hourly Charge Rate Schedule <br /> <br />Personnel Charges  <br />Charges for personnel engaged in professional and/or technical work are based on the actual hours directly <br />chargeable to the project. <br />Current rates by classification are listed below: <br /> <br />  Classification  Rate/Hr  Classification  Rate/Hr  <br />Principal Project Manager $275 Construction Manager $250  <br />Senior Project Manager $250 Senior Resident Engineer $235  <br />Senior Engineer $235 Resident Engineer $210  <br />Associate Engineer $210 Assistant Resident Engineer $190  <br />Assistant Engineer $195  <br />Junior Engineer $185  <br />Designer $175  <br />GIS Analyst $175  <br />Technician $160  <br />Engineering Trainee $135  <br /> <br />Litigation Charges  <br />Work done in preparation for litigation and other very high level-of-expertise assignments is charged at <br />$400 per hour. Court or deposition time as an expert witness is charged at $500 per hour. <br /> <br />Materials and Services  <br />Subcontractors, special equipment, outside reproduction, data processing, computer services, etc., will be <br />charged at 1.10 times cost. <br /> <br />