My WebLink
|
Help
|
About
|
Sign Out
Home
5B Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250602
>
5B Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2025 10:05:47 AM
Creation date
9/15/2025 2:40:11 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
6/2/2025
Retention
Perm
Document Relationships
Reso 2025-059 Schaaf and Wheeler
(Amended)
Path:
\City Clerk\City Council\Resolutions\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consulting Services Agreement between City of San Leandro and <br />Schaaf and Wheeler for Caltrans TCD Scope of Work– Page 2 of <br />Perform a materials forensic investigation of the existing concrete lined channel to evaluate the <br />thickness of the existing concrete slab and walls, perform a limited scanning survey to evaluate <br />the presence, spacing, and size of reinforcing steel, perform field concrete coring, obtain a sample <br />of the steel reinforcement, and perform laboratory testing. <br />Task 5: Design Documents <br />This task involved the preparation of construction bid documents including, but is not limited to the <br />following items: <br />Concurrently with field investigations, 30% PS&E (Plans, Specifications, and Estimate) will be <br />developed for review by the City and Caltrans to identify proposed structures, project <br />configuration, coordination items, maintenance, and construction access. Assumes a table of <br />specification contents. <br />Submittal of 70% / 100% PSE. Construction drawings are to be furnished in AutoCAD using City <br />format. Technical specifications are to be prepared in MS Word, in accordance with the <br />Construction Specifications Institute (CSI) format. City to prepare front end special provisions. <br />Dewatering plan and water pollution control plan specification sections will be developed to <br />provide guidance and limitations to the contractor as part of the bid packages. <br />Project assumes an inflatable weir with electronic controls: Includes electrical design sheets and <br />specifications. Includes PG&E Application assuming 120/240 volts single phase power which is <br />available within 200 feet of the project site. <br />Structural and Geotechnical engineering design reports and review of 100% design plans for <br />concurrence. <br />Incorporate recommendations and comments from City and Caltrans reviews. This scope <br />assumes one round of compiled comments from each agency based on the basis of design report <br />and 70% PSE. <br />Task 6: Environmental Clearances and Permit Applications <br />This task includes the preparation, submittal, and approval of typical regulatory agency permits needed <br />for completion of the project. <br />Prepare required agency encroachment permits, including Caltrans, Alameda ACFC, and the <br />Alameda County Mosquito Abatement District. Assumes 2 coordination meetings with each <br />agency. <br />Environmental clearances, including the following: <br />Biological Resources Assessment Report <br />Aquatic Resources Delineation Map and Data Sheets <br />CEQA IS/MND for Site 14.1 <br />CEQA Catex and NOE for site 14.2 <br />Regulatory Agency Coordination <br />Regulatory permit applications from the Regional Water Quality Control Board (RWQCB), the <br />California Department of Fish and Wildlife (CDFW), and the Army Corps of Engineers (Corps) <br />This scope assumes one round of compiled comments from each agency based on the <br />design report and 70% PSE. <br />Attachment B
The URL can be used to link to this page
Your browser does not support the video tag.