Laserfiche WebLink
Park NameAcreageImprovement TierRecommendations <br />Priority LevelBasic Improvements <br />or Life-Cycle <br />Replacement <br />New Amenities <br />Estimated CostCommunity Parks <br />Chabot Park 4.8 A: <br />Sustaining <br />amphitheater; <br />playground/swings; <br />parking; picnic area; <br />amphitheater; playground/ <br />swings; parking; picnic area; <br />planting update; signage <br /> $562,500* 3 <br />Marina Park 17.9 B: <br />Strategic fitness equipment fitness equipment $1,937,500 2 <br />Washington <br />Manor Park 14 C: <br />Visionary Refer to Site-Specific Master Plan $13,828,155 2 <br />Neighborhood Parks <br />Bonaire <br />Park 5.4 B: <br />Strategic <br />perimeter walking-path; shade <br />structure(s), storage, fitness <br />equipment; dispersed picnic <br />sites; bike racks <br />$271,250*2 <br />Cherry <br />Grove Park 7 B: <br />Strategic <br />restrooms; upgrade <br />tennis courts to <br />accomoate pickleball; <br />bike racks; consolidated, <br />assessible, and shaded picnic <br />areas; community garden; <br />shade structure and trees <br />$481,250*3 <br />Floresta Park 0.8 B: <br />Strategic playground; <br />bike racks; shade structure and <br />trees; perimeter walking path, <br />replace ballfield with high- <br />demand amenities <br />$750,000*2 <br />Halcyon <br />Park 4.9 A: <br />Sustaining playground; paving; <br />shade structure; expanded <br />picnic areas, replace concrete <br />volleyball court with sand; <br />remove boulders from lawn <br />$463,750*1 <br />Stenzel Park 9.3 <br />A: Sustaining pathways <br />shade trees, signage, <br />drinking fountain, expanded <br />playground <br />$412,500*4 <br />C: Visionary To be based on Site-Specific Master Plan $14,531,250**1 <br />TABLE 5.2 | Park by Park Recommended Improvements <br />* ADA, Landscaping, and Furniture improvements are included under System-Wide Improvements <br />** Cost estimated based $1M per acre Park NameAcreageImprovement TierRecommendations <br />Estimated CostPriority LevelBasic Improvements <br />or Life-Cycle <br />Replacement <br />New Amenities <br />Neighborhood Parks <br />Thrasher Park 4.2 <br />A: Sustaining bike racks $0*2 <br />C: Visionary To be based on Site-Specific Master Plan $6,626,250**3 <br />Memorial Park 2.7 N/A N/A – currently being renovated $0 N/A <br />Toyon Park 2.1 A: Sustaining walking path shade structure, bike rack $500,000*1 <br />Siempre Verde <br />Park 1.8 A: Sustaining $0*5 <br />Tony B. <br />Santos Park 1 A: Sustaining bike racks $0*4 <br />Mini Parks <br />Root Park 0.8 A: Sustaining bike racks;$0*5 <br />Victoria Park 0.3 A: Sustaining $0*5 <br />Warden Park 0.3 A: Sustaining ADA improvements; bike racks $0*5 <br />Special Use Parks <br />Dog Park 1.3 A: Sustaining shade trees $0*4 <br />System-Wide Improvements <br />ADA Accessibility Improvements $2,800,000 <br /> Landscaping Update $350,000 <br /> Irrigation Update conversion to a <br />centralized system $1,500,000 <br />Furniture Replacement & Upgrades Replacement of worn grills, trash cans, benches, signage, <br />tables, etc. in all parks. Addition of bike racks in all parks $1,400,000 <br />Total Estimated Cost $47,009,405 <br />* ADA, Landscaping, and Furniture improvements are included under System-Wide Improvements <br />** Cost estimated based $1M per acre <br />TABLE 5.2 | Park by Park Recommended Improvements (continued) <br />table continues on page 83 <br />San Leandro Park Master Plan | 82 DRAFT DRAFT 83 | Realizing Our Vision