Laserfiche WebLink
Lifecycle Replacement <br />All park elements have a finite lifespan and will eventually <br />require replacement. The lifecycle of each element varies <br />based on its type, use, and environmental factors. Table <br />5.2 identifies existing facilities currently in need of immediate <br />lifecycle replacement to help the City identify urgent repairs and <br />upgrades. Additionally, Table 5.3 provides cost estimates and <br />lifecycle timelines for a wide range of park amenities, enabling <br />the City to plan and budget for future replacement needs <br />systematically. These costs are fine-tuned to the Bay Area and <br />include installation. <br />Program Replacement <br />Timeline Unit Estimated Cost Notes <br />Recreation Amenities <br />Amphitheater 25-35 yrs Each $187,500-$375,000 Size varies based on seating needs <br />Basketball Court 20-30 yrs Each $62,000-$93,000 <br />Baseball/Softball Field 25-30 yrs Each $221,680-$299,920 Infield mix only, incl. bleachers and <br />fencing <br />Backstop 20-30 yrs Each $68,000-$92,000 <br />Bocce Court 10-15 yrs Each $33,000-$66,000 12' x 60' court <br />Community Garden 20-30 yrs Sq Ft $5-$10 <br />Disc Golf Course 10-20 yrs Each $1,100-$2,200 Cost per hole <br />Dog Park 20-30 yrs Acre $630,000-$875,000 Includes surfacing, fencing, and agility <br />features <br />Fit Course 10-15 yrs Each $1,650-$2,750 Cost per equipment <br />Multiuse Field - Artificial <br />Turf 7-10 yrs Each $1,100,000-$1,650,000 Field only, size may vary <br />Multiuse Field - Lawn 25-35 yrs Sq Ft $2-$4 Sod, irrigation <br />Pickleball Court 10-20 yrs Each $110,000-$165,000 4 courts <br />Playground 15-20 yrs Each $250,000-$1,100,000 Dependent on size and features <br />Pump Track 10-20 yrs Each $20-$30 grading, trees, hydroseed, furnishing <br />Roller Rink 20-30 yrs Each $22,000-$45,000 Asphalt surface with painted lines <br />Skate Park 20-30 yrs Sq Ft $350-$800 In-ground <br />Splash Pad 20-30 yrs Each $850,000-$1,150,000 <br />Tennis Courts 20-30 yrs Each $110,000-$165,000 <br />Volleyball 20-30 yrs Each $16,500-$27,500 Sand and nets <br />TABLE 5.3 | Estimated Lifecycle Replacement Periods and Costs <br />table continues on page 87 <br />TABLE 5.3 | Estimated Lifecycle Replacement Periods and Costs (continued) <br />Program Replacement <br />Timeline Unit Estimated Cost Notes <br />Structures <br />Aquatic Center 25-30 yrs Sq Ft $550-$825 Depends on pool type <br />Concession Stand 20-30 yrs Sq Ft $450-$650 <br />Shade Sail 25-35 yrs Each $33,000-$110,000 Size varies <br />Shade Structure 25-35 yrs Each $275,000-$550,000 20'x20' Structure <br />Recreation Center 40-50 yrs Sq Ft $550-$650 <br />Restroom 20-30 yrs Each $385,000-$550,000 Multiple unisex single occupancy <br />Furnishing <br />Bench 15-20 yrs Each $1,500-$3,500 <br />Bike Rack 10-15 yrs Each $550-$1,650 <br />Bleachers 20-30 yrs Each $4,250-$5,750 5 row <br />Barbeque 10-15 yrs Each $550-$1,650 <br />Drinking Fountain 10-15 yrs Each $13,500-$16,500 <br />Picnic Table 15-20 yrs Each $2,500-$5,500 <br />Trash Receptacle 10-15 yrs Each $2,000-$3,000 <br />Paving <br />Trail (Unpaved)20-25 yrs Sq Ft $4-$6 <br />Trail (Paved)20-30 yrs Sq Ft $27-$45 Concrete Surface <br />Asphalt Paving 20-30 yrs Sq Ft $6-$10 <br />Concrete Paving 20-30 yrs Sq Ft $20-$30 <br />Decomposed Granite <br />Paving 20-30 yrs Sq Ft $13-$17 <br />Playground Surfacing - <br />Wood Fiber n/a Sq Ft $8-$12 <br />Playground Surfacing - <br />Rubber 7-10 yrs Sq Ft $32-$44 <br />Plaza Paving 20-30 yrs Sq Ft $25-$50 Stamped Concrete or Unit Pavers <br />Lighting <br />Court Lighting 25-35 yrs Each $48,000-$72,000 <br />Field Lighting 20-30 yrs Each $550,000-$1,000,000 <br />Pedestrian Light Pole 25-35 yrs Each $8,500-$11,500 <br />Plants <br />Tree n/a Each $375-$750 Varies widely by tree type <br />San Leandro Park Master Plan | 86 DRAFT DRAFT 87 | Realizing Our Vision