|
BID SUMMARY
<br />BID OPENING
<br />DATE: April 10, 2025 Date Approved:
<br />TIME: 3:00 pm
<br />LOCATION: City Clerk's Office
<br />ITEM
<br />NO.ITEM UNIT COST ITEM COST
<br />BASE BID
<br />1 Furnish all materials, equipment, and
<br />labor to construct the work shown on
<br />the plans or noted in the specifications,
<br />excluding Bid Item 2, and Additive
<br />Alternates A1 through A4.
<br />1 LS $7,090,000.00 $7,090,000.00
<br />2 Sheeting, shoring and bracing per
<br />Specification Section 01 70 30 – 3.02.
<br />1 LS $10,000.00 $10,000.00
<br />TOTAL BASE BID:$7,100,000.00
<br />BID ALTERNATE A
<br />A1 Ornamental Ceiling in Children’s
<br />Reading Room per 01 29 00 – 1.09
<br />1 LS $14,000.00 $14,000.00
<br />A2 Monument Sign Lighting per 01 29 00
<br />– 1.09
<br />1 LS $4,900.00 $4,900.00
<br />A3 Exterior Trellis per 01 29 00 – 1.09 1 LS $98,000.00 $98,000.00
<br />A4 City Standard Curb, Gutter, Sidewalk,
<br />Ramp and Driveway per 01 29 00 –
<br />1.09
<br />1 LS $224,000.00 $224,000.00
<br />TOTAL BID ALTERNATE A:$340,900.00
<br />PROJECT TITLE:Mulford Marina Branch Library
<br />PROJECT NO.:
<br />BID NO.:
<br />ENGINEER'S ESTIMATE
<br />2018.2400
<br />24-25.007
<br />Prepared by: M. Goralka
<br />QUANTITY
<br />
<br />Mar Con Builders, Inc. CWS Construction Group, Inc.
<br />8108A Capwell Drive 1301 Grant Ave, Ste. B
<br />Oakland, CA 94607 Novato, CA 94945
<br />Phone: (510) 639-1914 Phone: (925) 658-1600 ext. 117 Phone: (415) 209-0229
<br />Fax: (510) 639-1915 Fax: (925) 658-1604 Fax:
<br />UNIT COST UNIT COST UNIT COST
<br />$8,161,339.00 $8,161,339.00 $8,353,588.00 $8,353,588.00 $8,965,000.00 $8,965,000.00
<br />$0.00 $0.00 $6,500.00 $6,500.00 $20,000.00 $20,000.00
<br />$8,161,339.00 $8,360,088.00 $8,985,000.00
<br />$40,035.00 $40,035.00 $47,220.00 $47,220.00 $78,600.00 $78,600.00
<br />$15,404.00 $15,404.00 $15,950.00 $15,950.00 $104,000.00 $104,000.00
<br />$121,343.00 $121,343.00 $85,870.00 $85,870.00 $85,600.00 $85,600.00
<br />$86,318.00 $86,318.00 $205,400.00 $205,400.00 $245,000.00 $245,000.00
<br />$263,100.00 $354,440.00 $513,200.00
<br />ITEM COST ITEM COST ITEM COST
<br />W.E. Lyons Construction Co.
<br />1301 Ygnacio Valley Rd, Ste 200
<br />Walnut Creek, CA 94598
<br />Mulford Marina Branch Library Bid Summary Page 7 of 12 Printed 4/15/2025 @ 8:46 AM
|