My WebLink
|
Help
|
About
|
Sign Out
Home
5B Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250616
>
5B Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2025 11:22:05 AM
Creation date
9/15/2025 3:24:13 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
6/16/2025
Retention
Perm
Document Relationships
Reso 2025-073 Giant Construction for Mulford Marina Branch Library Project
(Amended)
Path:
\City Clerk\City Council\Resolutions\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BID SUMMARY <br />BID OPENING <br />DATE: April 10, 2025 Date Approved: <br />TIME: 3:00 pm <br />LOCATION: City Clerk's Office <br />ITEM <br />NO.ITEM UNIT COST ITEM COST <br />PROJECT TITLE:Mulford Marina Branch Library <br />PROJECT NO.: <br />BID NO.: <br />ENGINEER'S ESTIMATE <br />2018.2400 <br />24-25.007 <br />Prepared by: M. Goralka <br />QUANTITY <br />TOTAL BASE BID: <br />TOTAL BASE BID + ALTERNATE BID ITEM A: <br />REQUIRED DOCUMENTATION: <br />Agreement to be Bound <br />SUBCONTRACTORS: <br />$7,100,000.00 <br />$7,440,900.00 <br />Bid Bond <br />San Leandro Local Business <br />25 % Participation <br />Addendum #1-4 <br />Good Faith Effort <br />Mar Con Builders, Inc. CWS Construction Group, Inc. <br />8108A Capwell Drive 1301 Grant Ave, Ste. B <br />Oakland, CA 94607 Novato, CA 94945 <br />Phone: (510) 639-1914 Phone: (925) 658-1600 ext. 117 Phone: (415) 209-0229 <br />Fax: (510) 639-1915 Fax: (925) 658-1604 Fax: <br />UNIT COST UNIT COST UNIT COSTITEM COST ITEM COST ITEM COST <br />W.E. Lyons Construction Co. <br />1301 Ygnacio Valley Rd, Ste 200 <br />Walnut Creek, CA 94598 <br />Basco <br />BK Mill Rick Slater Construction <br />Delta Bay BK Mill <br />Diablo Roofing CTU Precast <br />Alumawall <br />High Point <br />Marina Landscape Inc. <br />Basco Drywall <br />Ad Art <br />Marina Mechanical <br />Division 9 <br />Marina Mechanical <br />AMG <br />DV <br />Alumawall Swisher <br />YES YES <br />NO <br />$9,498,200.00 <br />$8,360,088.00 $8,985,000.00$8,161,339.00 <br />MEL Electric <br />$8,714,528.00$8,424,439.00 <br />YES <br />Rick Slater <br />Bay City Mechanical <br />American Glass <br />Ross McDonald <br />Nor Cal <br />AHS <br />Cal State Paving & Grading <br />YES <br />NO**NONO <br />YES YES <br />YES YES <br />Included Cover Form Only NO <br />YES <br />NO <br />CTV Pre Cast <br />Redstone Plumbing <br />American Window & Door <br />Pro Spectra <br />Marina Mechanical Service <br />Ross McDonald Co, Inc. <br />Sterling Environmental <br />Diablo Roofing Inc. DaSilva Underground <br />Construction <br />Zitro Acoustics Inc. <br />Coporate Sign Systems <br />McKim Corporation <br />Tom's Metal Specialists, Inc. <br />AMEX Sheet Metal <br />Marina Mechanical <br />Bay Cities Fire Protection <br />Alumawall <br />Prospectra <br />NorCal Waterproofing <br />Yiz Ironworker <br />Tecta America <br />Saehan Fire Protection <br />NO <br />System, Inc. <br />Corporation <br />Construction <br />American Window & Door <br />Con J. Franke Electric <br />Mulford Marina Branch Library Bid Summary Page 8 of 12 Printed 4/15/2025 @ 8:46 AM
The URL can be used to link to this page
Your browser does not support the video tag.