My WebLink
|
Help
|
About
|
Sign Out
Home
5I Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250707
>
5I Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2025 1:14:16 PM
Creation date
9/15/2025 4:49:26 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
7/7/2025
Retention
Perm
Document Relationships
Reso 2025-080 for Amendment 4 to CSA with Terraphase
(Amended)
Path:
\City Clerk\City Council\Resolutions\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Amendment No. 3 to <br />Consulting Services Agreement between City of San Leandro and Terraphase Engineering, Inc 9/13/2024 <br />for Treatment Wetland Design Services Page 6 of 8 <br />x Complete one round of review of the draft RFP1 from an engineering/design perspective prior to <br />City issuance. <br />Task 3.3: Bid Period Design Support <br />Terraphase will provide engineering design support during the construction bid period, including: <br />x Pre-bid conference: The pre-bid conference will be planned, scheduled, and led by the City or <br />others, with Terraphase project leads, including the project manager and design lead, to provide <br />technical support at the City’s direction. The conference agenda and all other materials will be <br />prepared by others. Post-conference summary and actions will be provided by others. <br />x Bidder question response and RFP1 addenda: Terraphase project leads will review bidder <br />questions as they are submitted to the City and support the City in development of up to six RFP1 <br />addenda. Addenda will consist of written/narrative question responses, recommended revisions to <br />technical content in the RFP1, or revision markups to IFB plans and specifications. <br />x Proposal review and evaluation: Terraphase will review all proposals received by the City and <br />attend one teleconference to discuss any engineering/design feedback arising from proposal <br />review. <br />All communication with bidders during the bid period will be led by the City or others. <br />Task 4: Project Management and Coordination <br />Terraphase will provide project and financial management of the proposed scope of work, including: <br />o During execution of Task 1, Terraphase will provide weekly updates to the City throughout the <br />premobilization, field implementation, and post-test sampling phases of the project. After submittal <br />of the draft closeout report, Terraphase and the City will meet to discuss report comments and <br />lessons learned from the pilot test to be incorporated into the final pilot test closeout report and <br />planning and development of the full-scale stabilization project. <br />o Attendance of two 1-hour construction procurement kickoff meetings with the City, one for each <br />contract package (Tasks 2 and 3). The kickoff meeting will planned and scheduled by others, with <br />Terraphase responsible for preparing materials limited to Terraphase’s design support role. <br />o Coordination and communication of project status during active Terraphase involvement during <br />Tasks 2 and 3, including internal technical coordination and weekly status updates with the City. <br />This update will include update of a project status and issues table and weekly teleconference <br />status meeting with the City, Terraphase project manager (Lucas Paz, PhD), and Terraphase <br />design support lead (Shakeel Jogia, PE, PMP, CCM). <br />o Low-level project status coordination with the City during the inactive period between completion of <br />Task 2 and initiation of Task 3 to account for stabilized surface settlement after completion of the <br />Soil Stabilization Project and before installation of the treatment wetland. This task assumes brief <br />monthly updates with the City for an up to 6-month inactive period. <br /><br />
The URL can be used to link to this page
Your browser does not support the video tag.