My WebLink
|
Help
|
About
|
Sign Out
Home
5G Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250721
>
5G Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2025 10:02:59 AM
Creation date
9/16/2025 10:02:53 AM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
7/21/2025
Retention
Perm
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and Last revised [06/25/2025] <br />BKF Engineers for Macarthur Superior Roundabout Project Exhibit A – Page 1 of 11 <br />EXHIBIT A <br /> <br />SCOPE OF SERVICES <br /> <br />Scope of Services <br />The Scope of Service for the Consultant is a continuation of services that has been on-going since 2016. <br />Although the Consultant advanced an updated PS&E package this past winter, in conjunction with the <br />federal funding, evolving RAB design standards, City R/W impact avoidance/minimization goals, and <br />comments received (including project deviations and changes requested and/or required) from both <br />Caltrans and the City, the project is required to supplement/complete the following project investigations, <br />R/W and preliminary engineering (PE) services, in order to support NEPA clearance/PE and revised PS&E <br />design packages in 2025/26. The Consultant will provide new preliminary studies, investigations and <br />design services and reports have been requested or required by Caltrans or the City in order to complete <br />project design, receive approval, and obtain an encroachment permit before advertisement, bid, award and <br />construction. <br /> <br />Task 1 – Investigations, Right of Way (R/W) Services, and Preliminary Engineering <br />Supplement/complete the following project investigations, R/W and preliminary engineering (PE) <br />services, in order to support NEPA clearance/PE and revised PS&E design packages in 2025/26. The <br />following amended or new preliminary studies, investigations and design services and reports have <br />been requested or required by Caltrans or the City in order to complete project design, receive <br />approval, and obtain an encroachment permit before advertisement, bid, award and construction. <br />1) Supplemental Topographic Survey: BKF will conduct up to two (2) days of supplemental <br />topographic survey in order to collect the necessary additional/remaining horizontal and vertical control <br />information on the revised project limits and conforms, in order to update the base sheets to assist with <br />the revised and final design development in the subsequent PS&E submittals. <br /> 2) Caltrans Requested R/W Engineering, Survey and Mapping – Although this project will fall under <br />the PEER/EP approval process, it seems the decertified land transfer, federal funding process through <br />DLA, proximity of the project to I-580, and/or evolving R/W and Survey requirements have resulted in <br />comments necessitating the following R/W and Survey services to be provided, in order to obtain <br />approval: <br /> <br />a) R/W Engineering Field Work – In order to support items A through D and F, supplemental survey <br />control and field work will be required to ensure control reviewed and published to Caltrans is set to <br />their standards and required data analysis and documentation can be generated. Work may <br />require the locating/collection of control along I-580 itself, or to supplement prior survey/control <br />efforts currently presented on the title sheet; up to two (2) days of R/W Engineering field work and <br />office time have been identified to support these comments and requirements. <br /> <br />b) Prepare Appraisal Map and/or Record R/W Mapping – Based on R/W Engineering field work <br />conducted, and in order to support the R/W Certification approval process along with the Project <br />Control Sheets, PSCR, monumentation, and plat and legals, Caltrans has requested a <br />signed/stamped base map appraisal map and R/W record map. This will need to present the R/W <br />requirements, including (but not limited to) the decertified parcel, additional fee acquisitions (if
The URL can be used to link to this page
Your browser does not support the video tag.