My WebLink
|
Help
|
About
|
Sign Out
Home
5G Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250721
>
5G Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2025 10:02:59 AM
Creation date
9/16/2025 10:02:53 AM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
7/21/2025
Retention
Perm
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and Last revised [06/25/2025] <br />BKF Engineers for Macarthur Superior Roundabout Project Exhibit A – Page 2 of 11 <br />required), or temporary easements (including no-fee permission to enter and construct agreement <br />areas if deemed feasible). <br /> <br />c) Project Control Sheets – Although this is primarily a City public works improvement project located <br />within San Leandro jurisdiction following City standards/format, Caltrans has requested a separate <br />Project Control Sheet, following their requirements/format for PS&E under the Caltrans CADD <br />Manual. The Project Control Sheet will include horizontal datum, combined factor, vertical datum, <br />benchmarks, coordinates/elevations to support the project control points, PSCR, and R/W <br />Engineering Field work conducted. <br />d) Project Survey Control Report – BKF will prepare a project control report for the project control, as <br />part of the permanent survey office records. As a PLS, BKF will sign, seal, and submit all <br />documents relevant to the project control survey for archiving, and will comply with the <br />requirements of the Caltrans Survey Manual. <br /> <br />e) Monuments and Filing of Record of Survey - Based on Caltrans Guidelines for LPO Review, <br />Monuments need to be set to demarcate new right of way lines in accordance <br />with Section 10.16 of the Caltrans Surveys Manual. Although Caltrans decertified, sold, and <br />quitclaimed/deeded the land to the City, they are requesting monumentation and record of survey <br />for this parcel, now owned by the City. A Record of Survey must be filed in compliance with <br />Section 8762(b)(4) of the Professional Land and Surveyors’ Act. The Record of Survey must be <br />submitted to Caltrans for review and comment prior to filing with Alameda County. <br /> <br />f) Plat and Legal – Although R/W avoidance and minimization is our goal, a plat map and legal <br />document (plat and legal) is required for projects along the state highway system (SHS) and/or <br />federalized projects, under DLA. The plat and legal for permanent or temporary acquisitions <br />(including TCEs, PTE&Cs etc) will be based on the approved appraisal mapping (Item B above), <br />and provided to the City’s appraiser who will provide all appraisals, offers, negotiations, closing <br />documents and recordation services in compliance with federal/DLA/Caltrans R/W requirements. <br />BKF has scoped one (1) plat and legal document. <br /> <br />3) RAB Geometric Design Update – Based on BKF’s RAB peer review conducted in spring 2025, the <br />project’s RAB geometry requires changes, refinements and optimization to support a host of design <br />requirements, including ingress/egress, turning movements, and bicycle, pedestrian, and vehicular <br />operations, safety and compliance. In addition to addressing new comments made by the City and <br />Caltrans, BKF will approach the RAB Geometric Design update at a preliminary engineering level to <br />revalidate lane widths; shoulders; non-motorized user facilities; inscribed circle diameter; entry widths; <br />circulating roadway width; entry/exit curve radii and arc length; entry angles; channelization and <br />pavement markings; bus/truck aprons; designated landscape/hardscape areas; and bike/ped <br />compliance with RABs. We will prepare an updated/revised geometric base at a preliminary <br />engineering level for City review/comment, and future refinement/finalization during the 100% PS&E <br />package. <br /> <br />4) Utility Potholing – Although originally excluded, the need for subsurface utility investigations will be <br />needed to manage risk/costs, and support new or revised project features, including lighting, traffic <br />control devices, expanded roadway excavation/pavement replacement requirements, possible drainage <br />appurtenances, and foundation work (retaining wall). A placeholder providing up to one (1) day of
The URL can be used to link to this page
Your browser does not support the video tag.