My WebLink
|
Help
|
About
|
Sign Out
Home
Amendment No 4 Terraphase 07172025 Combined
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2025
>
Amendment No 4 Terraphase 07172025 Combined
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2025 3:38:43 PM
Creation date
12/17/2025 3:46:57 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
7/14/2025
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Amendment No. 4 to <br />Consulting Services Agreement between City of San Leandro and Terraphase Engineering, Inc 7/17/25 <br />for Treatment Wetland Design Services Page 7 of 11 <br />compliance reporting as described in the Engineering, Construction, and CGP Compliance <br />Management Scope of Work. <br /> <br />This task assumes a 6-week total duration for this phase of the Stabilization Project for on-site oversight <br />and management scope, based on review of the provisionally selected Contractor’s proposal. If the <br />Contractor’s actual construction schedule requires additional on-site oversight, Terraphase will confirm the <br />additional effort with the City, including requesting additional budget if required. <br /> <br />As this task does not include full-time oversight for the full duration of this phase, the assumed level of <br />effort for this task does not cover any additional required pre-, during-, or post-storm SWPPP BMP <br />inspections during this phase if these are required when Terraphase staff are not already on site. If <br />required, Terraphase will confirm the additional effort with the City, including potentially requesting <br />additional budget. <br /> <br />Task 5: Closeout Phase Engineering, CM, Compliance Management <br />The Closeout phase of the project is defined as the period beginning with completion of post-stabilization fill <br />and continuing through installation of the post-fill dewatering system, Contractor closeout inspections and <br />submittals, site cleanup, City issuance of final completion to the Contractor, and demobilization from the <br />Site. <br />Terraphase will provide all engineering/QA, CM, and CGP compliance management as described in the <br />Engineering, Construction, and CGP Compliance Management Scope of Work described above during the <br />Closeout phase of the project, and as further detailed below: <br /> <br />• Oversee installation of the post fill dewatering system, assuming 1 day on-site per week by the <br />Terraphase staff level field manager for 2 weeks (2 total days on-site). <br />• Review, provide comments, and/or approve the following initial Contractor submittals: <br /> Draft and completed project completion punch lists. <br /> Contractor as-built redline markups. <br /> Stabilization Operations Plan <br />• Prepare project Record Drawings based on Terraphase construction QA records and approved <br />Contractor redline markups. <br />• Manage and facilitate the on-site construction closeout process, including Contractor punch-list <br />review, substantial completion inspection, and final completion inspection, including 1 full-day <br />site visit and one partial-day site visit by the Terraphase engineering/CM lead. <br />• Compile and transmit all project documentation to the City for archiving, including closing <br />access to the project CMIS. <br />• Assisting the City as needed for City closeout of their contract with the Contractor. <br />• Conduct one weekly on-site BMP inspection during Contractor demobilization and cleanup. <br /> <br />This task assumes a 2-week field duration and subsequent 2-week off-site duration for this phase of the <br />Stabilization Project, based on review of the provisionally selected Contractor’s proposal. Terraphase will <br />not be on-site during this phase other than as described above. If the Contractor’s actual construction <br />schedule requires additional on-site oversight, Terraphase will confirm the additional effort with the City, <br />including requesting additional budget if required. <br /> <br />Docusign Envelope ID: 273A48E5-126B-49E9-B9E2-7FB9D28A1969
The URL can be used to link to this page
Your browser does not support the video tag.