Laserfiche WebLink
<br />Amendment No. 4 to <br />Consulting Services Agreement between City of San Leandro and Terraphase Engineering, Inc 7/17/25 <br />for Treatment Wetland Design Services Page 9 of 11 <br />attendance of the pre- bid conference and response to technical requests during <br />conference planning performed by others. <br />• Develop a more extensive Phase 2 cost estimate update than the currently contracted update. The <br />current contracted Terraphase scope of work is limited to removing Stabilization Project line items <br />from the 100% Design cost estimate and escalating existing estimate unit rates to 2025 values <br />using estimating software. The requested additional scope of work includes outreach to material <br />suppliers and subcontractors to provide a more detailed estimate of significant and higher-risk <br />construction tasks, including the MABR system and treatment wetland subgrade liner. <br />• As discussed with the City in May 2025, Terraphase will provide engineering and coordination <br />support with the City and others to integrate the Phase 2 instrumentation and controls (I&C) system <br />into the WPCP I&C system. This was identified as a potential schedule and cost risk to the City, as <br />the currently approved Phase 2 design identifies MABR operational parameters and shows Phase <br />2 communications cables terminating at a junction box at the WPCP. The objective of the proposed <br />I&C integration effort is to describe the Phase 2 system’s control strategy, how Phase 2 controls <br />are integrated with the WPCP controls system, and how the WPCP controls system displays and <br />controls the Phase 2 system. The deliverable for this effort is a technical memorandum that <br />describes these parameters such that the City’s I&C engineer can design the required I&C <br />infrastructure and WPCP I&C system modifications as needed. Terraphase will be subcontract <br />engineering services from Presidio Systems, Inc. (PSI), and Fluence Corporation (Fluence) to <br />provide I&C engineering support during delivery of this task. <br />• As discussed with the City in May 2025, Terraphase will reevaluate and revise the design of the <br />WPCP effluent tie-in valve. This revision may include potentially changing the valve type (e.g., <br />changing from a gate valve to a butterfly valve), providing a make/model specification for the <br />appropriate motorized actuator for the valve, design of structural valve supports, and potential <br />revision of the specified valve vault to accommodate the confirmed valve, actuator and <br />appurtenances. The objective of this additional design scope is to not scope detailed design of the <br />tie-in valve as contractor design-build scope in the Phase 2 RFP. <br />• As discussed with the City in May and June 2025, Terraphase will facilitate a constructability <br />review of the Phase 2 subgrade liner system. This will include identifying and subcontracting a <br />qualified liner installation contractor, providing Phase 2 project background information and design <br />documents, coordinating with the constructability contractor during their review, and discussing <br />findings with the City. This task does not include revision of Phase 2 project plans, specifications, <br />or cost estimate to incorporate approved design changes identified during the constructability <br />review; any resulting revisions to Phase 2 design documents will be scoped and proposed at City <br />direction after completion of the constructability review. <br />• Update and maintain the Phase 2 project schedule through Phase 2 procurement. Terraphase will <br />prepare an initial Phase 2 schedule under the current Phase 2 design support task, but this <br />schedule <br /> <br /> <br />will be revised to add further task detail and updated task start dates as the Phase 2 construction planning, <br />engineering, and procurement progresses. <br />It is anticipated that this task will begin during construction of the Stabilization Project and continue through <br />bidding and procurement of Phase 2, likely in Q1 of 2026. <br /> <br />Docusign Envelope ID: 273A48E5-126B-49E9-B9E2-7FB9D28A1969