Laserfiche WebLink
<br />Amendment No. 5 to Consulting Services Agreement between the 3/2/2023 <br />City of San Leandro and BKF Engineers (MacArthur/Superior Roundabout) Page 2 of 6 <br /> <br /> <br />Addition to Task 6 – Final PS&E <br />Consultant to provide additional services replaced to the preparation and response to design comments for <br />the final PS&E package due to Caltrans comments and the additional design work for the retaining wall. <br /> <br />Addition to Task 8 – Final Ready to List / PEER PS&E Package <br />Consultant shall review, resolve and respond to comments from Caltrans on the final PS&E documents; <br />assemble final encroachment permit and project documents for bid advertisement, PEER check list; and <br />final encroachment permit application. <br /> <br />Additional to Tasks 2, 3 and 4 for Harris Design <br />Provide modifications to landscaping design per Caltrans review comments <br /> <br />Scope for Biggs Cardosa Associates <br />Subconsultant shall provide services related to design coordination; wall type selection; preparation of 65%, <br />95% and 100% design PS&E for the new retaining wall. <br /> <br />Scope for Parikh Consultants, Inc. <br />Subconsultant shall provide research existing geological information; conduct field exploration (soils boring, <br />sampling and testing); and Geotechnical Engineering design services related to the new retaining wall <br />DocuSign Envelope ID: 15E9BA7B-F547-4973-8BAD-A8DA8D429D1CDocusign Envelope ID: 03576432-3B39-4EC1-A7D7-FEA905D933FA