My WebLink
|
Help
|
About
|
Sign Out
Home
Amendment_5_to_CSA_Between_The_City_of_SL_&_Gates_Associates_Shoreline
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2026
>
Amendment_5_to_CSA_Between_The_City_of_SL_&_Gates_Associates_Shoreline
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2026 3:32:50 PM
Creation date
4/2/2026 3:48:58 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
1/13/2026
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and <br />Gates & Associates, Inc for Staff Augmentation Exhibit A – Page 25 of 31 <br />● Addenda <br />● Change order and Pay App review <br />● Submittal and RFI Responses <br />● Field Reports and Punch Lists <br />● Record Drawings (PDF and AutoCAD format) <br />● Meeting Agendas & Minutes <br />● Post Construction Report <br />● Pre-construction notices to agencies <br />● Post-construction notices to agencies <br /> <br /> <br />Pre-construction Meeting 1 <br />OAC Site Meetings 52 <br />Interim site inspections 12 <br />Final Punch 3 <br />Post Construction Review 1 <br /> <br /> <br />Consultant shall provide Construction Administration services for a duration of 52 weeks from <br />the construction notice to proceed. <br /> <br />The objective of this task is to provide additional services that may not have been included in the <br />base project scoping or could be an optional additional effort. Subtask 8.3 will require more <br />information and shall be negotiated upon request for service. <br /> <br />● Hand sampling techniques will be utilized to collect soil samples from six locations across <br />the land side footprint of the former Blue Dolphin Structure. Two soil samples will be <br />collected from each location (0 to 6-inch and 6 to 12-inch depth intervals). <br />● Hand sampling techniques will be utilized to collect sediment samples from six locations <br />within the water side of the former footprint of the Blue Dolphin structure. Samples will <br />be collected from exposed sediment at low tide. Two samples will be collected from each <br />location (0 to 6-inch and 6 to 12-inch depth intervals). <br />● An additional sediment sample location will be situated approximately 200 feet east of <br />the former Blue Dolphin structure. Sediment samples from this location will be collected <br />in the same manner and frequency as described above. This sample location will serve as <br />a control to determine if the reported concentrations of target analytes are a result of <br />impact from the burn area or represent background concentrations for the marina <br />sediments. <br />● The location, extent, and number of samples as well as sampling and testing methods will <br />be coordinated with the Waterboard as needed. <br />DocuSign Envelope ID: 30A47DAA-8ADC-4C81-A393-00F3D4407ED9Docusign Envelope ID: 13C1466D-0AAC-4076-BFEB-08C6F962971ADocusign Envelope ID: D3886DBE-B91A-48B8-8B13-98FC0D0AA5C3
The URL can be used to link to this page
Your browser does not support the video tag.