My WebLink
|
Help
|
About
|
Sign Out
Home
Amendment_5_to_CSA_Between_The_City_of_SL_&_Gates_Associates_Shoreline
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2026
>
Amendment_5_to_CSA_Between_The_City_of_SL_&_Gates_Associates_Shoreline
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2026 3:32:50 PM
Creation date
4/2/2026 3:48:58 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
1/13/2026
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and <br />Gates & Associates, Inc for Staff Augmentation Exhibit A – Page 26 of 31 <br />● Soil and sediment samples will be submitted to a state-accredited laboratory for analysis <br />of the following compounds on a discrete basis. <br />○ CAM 17 Metals by Environmental Protection Agency (EPA) Method 6010/7471 <br />○ Volatile organic compounds (VOCs) by EPA Method 8260B <br />○ Semi-volatile organic compounds (SVOCs) by EPA Method 8270 SIM <br />○ Asbestos by CARB 435A (400-point count) <br />● A sampling and testing report will be prepared, summarizing the sampling activity and <br />laboratory analytical results. Laboratory results will be compared to established soil <br />screening levels to determine appropriate soil handling, reuse, or disposal. <br />If the initial laboratory analytical results indicate exceedances of certain compounds, it is <br />conceivable that additional sampling and/or laboratory analyses may be necessary. However, <br />additional sampling or laboratory analyses beyond the scope mentioned above is not included in <br />the fee and can be negotiated after the initial test results come in. <br /> <br />Permitting fees are included for in water testing, however the fees for sedimentation testing are <br />currently not included. Sedimentation testing will require clarification from the Waterboard to <br />accurately provide a fee as the location of samples, number of samples, depths, and required <br />sediment compounds to be tested are unknown. <br />There is a potential of encountering contaminated soils at fuel storage area, as well as other <br />areas at the site. <br />● Preparation of an SMP to provide appropriate protocols to be followed if impacted media <br />are encountered during demolition and/or grading activities <br />○ Review of previous environmental sampling data and data collected during the <br />proposed additional sampling activities (See Task 2.4) will inform the <br />development of an SMP <br />● SMP will Provide guidelines for additional testing to identify full extent of contamination <br />encountered during demolition and/or grading activities <br />● SMP will provide specifications for typical disposal characterization activities <br />○ Final disposal characterization requirements will be determined based on desired <br />reuse scenario and/or receiving facility requirements <br />● SMP will identify potential disposal facilities <br />● SMP will discuss Import fill acceptance criteria for the Site <br />● SMP Implementation - Provide as-needed observation and sampling activities during <br />demolition and grading - Scope and fee to be determined based on field conditions <br />● SMP Completion Report - Fee to be determined based on field conditions and extent of <br />SMP implementation activities performed throughout the course of construction. <br />DocuSign Envelope ID: 30A47DAA-8ADC-4C81-A393-00F3D4407ED9Docusign Envelope ID: 13C1466D-0AAC-4076-BFEB-08C6F962971ADocusign Envelope ID: D3886DBE-B91A-48B8-8B13-98FC0D0AA5C3
The URL can be used to link to this page
Your browser does not support the video tag.