My WebLink
|
Help
|
About
|
Sign Out
Home
2026-11-02 Correspondence_Item 5c (El Nino)
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2026
>
Packet 11022026
>
2026-11-02 Correspondence_Item 5c (El Nino)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2026 9:09:55 AM
Creation date
11/3/2026 9:09:03 AM
Metadata
Fields
Template:
CM City Clerk-City Council
Retention
PERM
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•How residents receive urgent warnings, including outside normal <br />office hours. <br />•How management communicates when electrical power, telephone <br />service, or internet connections fail. <br />•How emergency instructions are made available to residents who <br />need translated or accessible communications. <br />•How management coordinates with emergency responders when <br />residents require mobility assistance, accessible transportation, or <br />other support. <br />•How residents can voluntarily identify assistance needs through an <br />appropriate, privacy-protected process, without having to disclose <br />personal medical information to neighbors or MBRA. <br /> <br />BSM's statutory duties do not necessarily require physically evacuating <br />individual residents. They do require a park-specific preparedness plan and <br />designated emergency responsibilities. We are asking BSM to demonstrate <br />how those duties connect to an actual emergency response. <br /> <br />Paper notices in English alone are not a reliable system <br />for communicating an immediate threat. <br /> <br />5. From the City: Accountability for the 2016 flood-protection <br />proposal <br />Mayor González and Councilmembers, the City must explain: <br />•What happened to the 2016 proposed engineered seawall project <br />and its anticipated FEMA funding. <br />•What communications occurred between City officials and BSM <br />concerning the proposal. <br />•Whether any subsequent flood-mitigation alternatives were evaluated <br />for Mission Bay. <br />•Why the City's Housing Element describes seawall construction along <br />Mission Bay's western edge as an accomplished improvement when <br />the engineered seawall was never built. <br />•Why the 2025 Environmental Hazards Element describes that same <br />infrastructure as a future requirement. <br />•What FEMA floodplain mapping decisions affected Mission Bay, and <br />which actual completed improvements supported those decisions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.