Laserfiche WebLink
The City must identify and correct inaccurate <br />representations in its adopted planning documents. <br /> <br />6. From the City: Drainage infrastructure, oversight, and public <br />investment <br />The City must identify: <br />•All City-owned and County-owned drainage facilities affecting Mission <br />Bay, including the Wicks Boulevard pumping station. <br />•The entities responsible for operating, inspecting, maintaining, and <br />replacing each component. <br />•The status of the improvements identified in the City's January 2024 <br />Draft Storm Drain Master Plan. <br />•The funding, scheduling, and implementation status of relevant <br />capital improvements. <br />•How the public drainage system interacts with Mission Bay's privately <br />operated drainage facilities, including potential shared failure points. <br /> <br />We are requesting a joint technical review involving City Public Works, <br />appropriate Alameda County flood-control representatives, BSM, and <br />MBRA. <br /> <br />The outcome must be a clear, documented <br />understanding of how stormwater leaves Mission Bay, what <br />happens when pumps or outlets fail, and who is responsible <br />for restoring system operations. <br /> <br />7. From the City: Emergency response responsibility <br /> San Leandro Municipal Code Chapter 3-4 establishes the City's <br />emergency planning and coordination responsibilities, including <br />coordination with private entities. The City must provide: <br />•The currently adopted Emergency Operations Plan and relevant <br />procedures governing emergency notification, evacuation warnings, <br />and response in Mission Bay. <br />•Records describing the actions taken during the December 5, 2024 <br />tsunami warning, including dispatch instructions, neighborhood <br />notifications, and direction given to responding personnel. <br />•Identification of the City official responsible for coordinating <br />emergency planning with Mission Bay management.