My WebLink
|
Help
|
About
|
Sign Out
Home
Comments on Agenda item 10a, November 16, 2026 meeting
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2026
>
Packet 11162026
>
Correspondence Batch 1
>
Comments on Agenda item 10a, November 16, 2026 meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2026 9:40:43 AM
Creation date
11/19/2026 9:40:42 AM
Metadata
Fields
Template:
CM City Clerk-City Council
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
James Maes <br />PO Box 493 <br />San Leandro, CA 94577 <br />james@jamesmaesforsanleandro.com <br /> <br />November 14, 2026 <br /> <br />San Leandro City Council <br />City of San Leandro <br />835 E. 14th Street <br />San Leandro, CA 94577 <br /> <br />Via email & e-comment <br /> <br />RE: Comments on the draft “Resolution of the City Council of the City of San Leandro <br />Affirming its Committment [sic] to Reopen Lake Chabot Road to Full Two-Way Vehicular <br />Use” (Item 10a. 26-466). <br /> <br />Dear Councilmembers: <br /> <br />I am writing to provide comments on the subject draft resolution, slated for discussion <br />and public comment on Monday, November 16, 2026. <br /> <br />Overall, I am concerned that this resolution is being proposed to reopen the full length <br />of Lake Chabot Road prematurely, without full geotechnical evaluation; without a full <br />understanding of the true costs of construction and long-term maintenance; and without <br />a complete evaluation of the safety risks to be borne by all San Leandrans who might <br />drive the road once reopened. In prior analyses, the City has noted a daily traffic count <br />of over 3,000 vehicles- ranging from passenger vehicles to heavy commercial vehicles <br />traveling on Lake Chabot Road. An attempt to reopen the road to full two-way traffic <br />without proper geotechnical engineering analyses puts our citizens at great safety risk <br />and opens the City of San Leandro to incredible financial liability should the road fail as <br />a result of shortcutting safety reviews. <br /> <br />It is not clear that the City has a full understanding of the life cycle costs of reopening <br />and maintaining this stretch of road. San Leandro residents need to understand what <br />tradeoffs might be under consideration if the costs for full reopening substantially <br />exceed available funds. For instance, if the City were to earmark multiple years of <br />Alameda County Measure BB funds to fully construct this project, how will that impact <br />the City’s ability to maintain roads across town to support expected increased truck <br />traffic from newly constructed warehouses? How could the East Bay Greenway project <br />be impacted? How would the residents of Mission Bay Mobile Home Park be impacted <br />regarding flood risk mitigation work if the City redirected infrastructure funding <br />exclusively to Lake Chabot Road? What percentage of roads in San Leandro would <br />devolve to full failure on the Pavement Condition Index if substantial funds were <br />redirected to Lake Chabot Road?
The URL can be used to link to this page
Your browser does not support the video tag.