My WebLink
|
Help
|
About
|
Sign Out
Home
Comments on Agenda item 10a, November 16, 2026 meeting
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2026
>
Packet 11162026
>
Correspondence Batch 1
>
Comments on Agenda item 10a, November 16, 2026 meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2026 9:40:43 AM
Creation date
11/19/2026 9:40:42 AM
Metadata
Fields
Template:
CM City Clerk-City Council
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I have provided mark-ups to the “resolve” clauses below. Deletions are shown <br />in strikethrough and additions in bold italics. Below each section, I describe the nature <br />of the change- the “why” behind the comment. <br /> <br /> <br />Section 1: Intent to Reopen & Geotechnical Safety Prerequisite <br />1. Intent to Reopen and Safety Prerequisites. The City Council affirms that Lake <br />Chabot Road be reopened to full two-way public vehicular traffic as soon as it is <br />determined that the roadway can be repaired and safely reopened only after: (a) <br />physical repairs at all identified slide locations (Sites 1, 2, 3, and 4) are <br />constructed and completed; and (b) a licensed geotechnical engineer and <br />the City Engineer certify in writing that the entire roadway corridor from <br />Estudillo Avenue to the eastern City limit is structurally stable and safe to <br />support full two-way daily commuter and heavy commercial vehicle loads. <br />Prior to full reopening, the City Manager shall maintain fail-safe emergency <br />responder and wildfire evacuation access protocols along the corridor. <br />The “why”- Ambiguity: <br />1. Who determines safety? The passive phrasing ("as soon as it is <br />determined") fails to specify whether that determination requires formal <br />certification by a licensed geotechnical engineer and the City Engineer, <br />or whether a simple Council majority can vote to declare it "safe." <br />2. Grammatical flaw: Literally read, "as soon as it is determined that the <br />roadway can be repaired and safely reopened" triggers reopening <br />upon the determination of feasibility, rather than after the physical <br />repairs are actually constructed, inspected, and certified complete. <br />3. No load or use standard: "Safely reopened" is not defined against <br />daily commuter volume and heavy commercial truck loads versus <br />limited emergency evacuation use. <br />The “why”- Misalignment Between Recitals and Operational Risk (Recitals <br />8–10) <br />• Draft Language: Recital 8 notes that the WUI-Go! study <br />assumed "ideal evacuation conditions, including immediate resident <br />response, full roadway availability, cooperative behavior, and the <br />absence of traffic accidents, downed power lines, disabled vehicles, or <br />other unexpected impediments." <br />• Ambiguity: Using a model that assumed unimpaired roadway <br />availability as the primary justification to rush two-way daily reopening <br />conflates emergency evacuation readiness (which can be <br />maintained via locked gates and roll-over bollards) with unrestricted <br />daily commuter traffic. If a short-term repair fails under daily
The URL can be used to link to this page
Your browser does not support the video tag.