My WebLink
|
Help
|
About
|
Sign Out
Home
Comments on Agenda item 10a, November 16, 2026 meeting
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2026
>
Packet 11162026
>
Correspondence Batch 1
>
Comments on Agenda item 10a, November 16, 2026 meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2026 9:40:43 AM
Creation date
11/19/2026 9:40:42 AM
Metadata
Fields
Template:
CM City Clerk-City Council
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The resolution never ties reopening to the completion and structural sign- <br />off of all four slide locations (including Phase 1 storm-damage repairs at <br />Sites 1 and 4, which are funded separately and scheduled for construction <br />in 2027). Because Section 1 does not explicitly condition reopening on the <br />completion of repairs across Sites 1, 2, 3, and 4, the resolution leaves <br />ambiguity about how the two separate funding tracks and construction <br />phases interlock before traffic is permitted. <br /> <br />Section 5: Reporting Without Action Gates <br />5. Regular Progress Reports. "The City Manager shall report to the City Council <br />Facilities Committee no less frequently than every 120 days, the City’s activities <br />related to reopening of Lake Chabot Road." <br />The “why”- Ambiguity: Routing updates exclusively to the Facilities <br />Committee every four months without requiring full Council review of the <br />geotechnical findings before reopening decisions are made reduces public <br />transparency on whether Sites 2 and 3 were truly cleared for permanent <br />loads. <br /> <br />Finally, this draft Resolution repeatedly uses the WUI Go! study as a basis for taking the <br />actions proposed. Will this study be made available to the public, so that we can fully <br />understand the scenarios, the methods used, and the evacuation routes examined? If <br />public funds are to be used to repair Lake Chabot Road on an accelerated schedule, <br />the basis for the decision should be in the public record. Thank you for accepting these <br />comments, and I look forward to the public discussion. <br /> <br />Sincerely, <br /> <br />/s/ <br /> <br />James Maes <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.