Laserfiche WebLink
commuter loads, the corridor could be completely destroyed and <br />unavailable during an actual wildfire. <br />Section 3: Corridor-Wide Comprehensive Geotechnical Evaluation <br />3. Comprehensive Engineering Evaluation. The City Manager is directed to <br />complete a comprehensive, corridor-wide geotechnical evaluation of all or a <br />portion of the entire roadway corridor from Estudillo Avenue to the eastern City <br />limit on Lake Chabot Road as needed for repairs, including subsurface <br />stability assessments of adjacent slopes and roadbeds, utilizing from the <br />$1.5 million secured through the State of California Budget Act of 2026. <br /> <br />The “why”: Calling the study "comprehensive" is contradicted by the <br />words "all or a portion" and "as needed for repairs." This allows staff or <br />a consultant to examine only isolated footprints (such as specific spots at <br />Sites 2 and 3) while skipping a corridor-wide subsurface evaluation of <br />adjacent slopes and roadbeds. Furthermore, because the evaluation is <br />capped by the $1.5 million state allocation—which must also pay for <br />physical work under Section 4(a)—the geotechnical investigation could be <br />legally truncated the moment funds run low. <br /> <br />Section 4: Separation of Short-Term Stabilization from Permanent Reopening <br />4. Repair Alternatives. Using the expertise of a licensed geotechnical <br />engineering consulting firm, staff shall prepare and present to the full City <br />Council an evaluation of repair alternatives that includes: <br /> <br />a. Short-term stabilization and slope protection repair options for Sites 2 & 3 <br />with the remaining balance of the $1.5 million secured through the State of <br />California Budget Act of 2026, strictly to prevent further erosion and maintain <br />emergency evacuation viability, which shall not serve as a substitute for <br />permanent structural repairs prior to reopening to routine daily vehicular <br />traffic; and <br /> <br />b. Long-term permanent structural repair options and cost estimates for Sites <br />2 & 3 necessary to support full two-way vehicular use. <br /> <br />The “why”: Taken together, Sections 1 and 4(a) create a direct mechanism <br />to apply a temporary, low-cost "short-term stabilization" patch at Sites 2 <br />and 3 and immediately declare the road ready for full two-way daily <br />traffic—bypassing the permanent structural repairs listed in Section 4(b). <br />Running 3,000+ daily vehicles (including heavy garbage, delivery, and <br />construction trucks) over a short-term fix on legacy slumping ground risks <br />catastrophic slope failure. <br />