Laserfiche WebLink
Name Page count CM City Clerk-City Council - Document Type Drawing Type Document Date (6) Recorded Document Type
NPSA Budget Blinds Fire Station 9 Window Treatments.docx[Icon] 26 Agreement 7/26/2024
NPSA Control Air City Hall Boiler Pump 4 Replacement.docx[Icon] 22 Agreement 12/16/2024
NPSA Control Air City Hall Boiler Supply Valve Replacement.docx[Icon] 21 Agreement 6/3/2024
NPSA Control Air Senior Center Boiler Blower Replacement.docx[Icon] 18 Agreement 6/4/2024
NPSA Control Air Senior Center Heat Pump Replacement.docx[Icon] 22 Agreement 12/20/2024
NPSA Control Air WPCP Boiler Variable Frequency Drive.docx[Icon] 21 Agreement 8/1/2024
NPSA Cummins Senior Center Generator Repair.docx[Icon] 22 Agreement 7/11/2024
NPSA Denalect Access Control Modifications at PWSC.docx[Icon] 22 Agreement 12/20/2024
NPSA Denalect CCTV Estudillo Garage and City Hall_3-22-24.docx[Icon] 23 Agreement 8/14/2024
NPSA Denalect CCTV Water Pollution Control Plant.docx[Icon] 21 Agreement 8/8/2024
NPSA Denalect Public Works Admin Building Intercom System.docx[Icon] 22 Agreement 12/20/2024
NPSA Dillard Environmental Services BPO.docx[Icon] 18 Agreement 5/28/2024
NPSA East Bay Refrigeration MCC Refrigerator Replacement.docx[Icon] 22 Agreement 9/27/2024
NPSA Garland Fire Station 9 and 12 Roof Repairs.docx[Icon] 21 Agreement 7/24/2024
NPSA Garland PWSC and History Museum Roof Repairs.docx[Icon] 54 Agreement 8/7/2024
NPSA Holloway Biosolids Removal Final 2024-10-10.docx[Icon] 21 10/25/2024
NPSA Kirby Tree Service 2024-25[Icon] 23 Agreement 5/15/2024
NPSA Marine Emporium Boatyard Tow Two Sailboats.docx[Icon] 18 Agreement 6/26/2024
NPSA Monterey Mechanical for Tide Gate Repairs 2024[Icon] 24 Agreement 6/3/2024
NPSA R&S Overhead Door - Exterior Pedestrian Gates ‎(2)‎.docx[Icon] 21 Agreement 8/7/2024
NPSA R&S Overhead Door - Exterior Pedestrian Gates.docx[Icon] 21 Agreement 8/7/2024
NPSA R&S Overhead Door-Sliding Gate Project.docx[Icon] 22 Agreement 5/28/2024
NPSA Rubicon Landscape Group V-Ditch Clean-Out.docx[Icon] 20 11/5/2024
NPSA Rubicon Landscape Washington Ave Underpass Clean-Up.docx[Icon] 19 Agreement 8/14/2024
NPSA SF Elevator City Hall Elevator Power Unit.docx[Icon] 21 Agreement
Page 7 of 10
2
3
4
5
6
7
8
9
10
Last
228 Entries
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.