Laserfiche WebLink
CITY OF SAN LEANDRO <br />STAFF REPORT <br />DATE: June 21, 2010 <br />TO: <br />FROM: <br />BY: <br />Stephen L. Hollister, City Manager <br />Uchenna Udemezue Directo <br />APPROVED AND <br />FORWARDED <br />TO CITY COUNCIL <br />Stephen L. Hollister <br />City Manager <br />Engineering and Transportatio Department <br />Keith Cooke, Principal Engineer <br />Engineering and Transportation Dep ent <br />SUBJECT PROJECT/PROJECT DESCRIPTION: <br />RESOLUTION APPROVING PLANS AND SPECIFICATIONS AND AUTHORIZING THE <br />CALL FOR BIDS FOR THE ANNUAL SIDEWALK PROGRAM 2010-11, PROJECT NO. 10- <br />144-36-006. <br />This project provides for removal and replacement of damaged concrete sidewalk, driveway <br />approaches, curbs, and gutters throughout the city. <br />SUMMARY AND RECOMMENDATION <br />Staff recommends approval of the plans and specifications and call for bids on the subject <br />project. <br />BACKGROUND <br />Property owners are required by both the State Highway Code and San Leandro Municipal Code <br />to maintain the sidewalks along their frontage. The City operates a sidewalk repair program, <br />described in Title 8 of the San Leandro Administrative Code, which provides for the repair of <br />sidewalk damage. Minor defects are ground or patched at no (direct) charge to property owners. <br />Larger defects that require removal and replacement of the concrete are also repaired under the <br />program, but the property owner adjacent to such a defect must reimburse the City for the full <br />construction cost unless a City street tree is the cause of damage. Property owners are only <br />responsible to pay for %2 the construction cost for damage caused by a City street tree. <br />In addition to the repair of sidewalk, this project will include the installation of some sidewalk <br />curb ramps to meet current Americans with Disabilities Act (ADA) requirements. As part of the <br />City's ADA curb ramp transition plan, several updated sidewalk curb ramps are installed each <br />year. These ramps are installed adjacent to new street work, at resident requested locations and <br />eventually at all intersections. <br />