My WebLink
|
Help
|
About
|
Sign Out
Home
8D Consent 2016 0307
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2016
>
Packet 2016 0307
>
8D Consent 2016 0307
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 4:12:25 PM
Creation date
3/1/2016 11:38:18 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
3/7/2016
Retention
PERM
Document Relationships
_CC Agenda 2016 0307 CSAmended+RGAmended
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 0307
Reso 2016-029
(Reference)
Path:
\City Clerk\City Council\Resolutions\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of San Leandro <br />Meeting Date: March 7, 2016 <br />Staff Report <br />Agenda Section:File Number:15-733 CONSENT CALENDAR <br />Agenda Number:8.D. <br />TO:City Council <br />FROM:Chris Zapata <br />City Manager <br />BY:Keith Cooke <br />Engineering & Transportation Director <br />FINANCE REVIEW:David Baum <br />Finance Director <br />TITLE:Staff Report for a Resolution Accepting the Work for the Fiber Conduit for <br />Broadband Network Project, Project No. 2013.0320 <br />SUMMARY AND RECOMMENDATIONS <br />Staff recommends that the City Council accept the work and authorize the City Manager to file <br />the Notice of Completion, release the performance and payment bonds, and release the <br />maintenance bond upon successful completion of the one-year maintenance period. <br />BACKGROUND <br />In partnership with Lit San Leandro and to promote business growth in the local area, high <br />speed communication infrastructure was expanded into underserved industrial areas of the <br />City, primarily the Adams Tract, Catalina/Farallon area, and the southern Alvarado corridor. <br />The City received grant funding from the United States Economic Development Agency (EDA) <br />for the installation of communication conduits. <br />The project expanded the City’s communications network capability by installing <br />approximately eight and a half miles of conduit ready to receive fiber optic cables. The City’s <br />fiber optic conduit network now exceeds 26 miles (see attached map). <br />A favorable bidding environment allowed this project to be completed under budget and add <br />additional conduit alignments into the project scope. A contract change order enabled an <br />increase from 7.5 to 8.5 miles of installed conduit and at completion, the project remained <br />under budget. Remaining grant funds will be used in a subsequent project to further increase <br />the fiber optic conduit network. <br />In addition to promoting growth and creating jobs in the industrial sector, the extensive conduit <br />network infrastructure also provides the opportunity for schools, the community and <br />businesses throughout the city to easily and readily connect to high speed internet <br />communication service. The planning, investment and effort placed in building the network is <br />Page 1 City of San Leandro Printed on 3/1/2016
The URL can be used to link to this page
Your browser does not support the video tag.